My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners - Planning & Urban
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Bermello Ajamil
>
Bermello Ajamil & Partners - Planning & Urban
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 4:27:12 PM
Creation date
5/31/2012 4:26:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs.
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.12 Budget / Rough Order of Magnitude - Prepare a preliminary budget estimate. <br />1.13 Schedule - B&A will prepare an updated schedule for implementation including regulatory <br />permitting. <br />1.14 Executive Summary - Develop a written report, or “Program Statement,” based upon the information <br />gathered. This report will include a summary of goals and objectives, an assessment, list of defi ciencies, <br />a description of alternatives to be considered, a description of the recommended approach and a <br />schedule. <br />1.15 Internal meetings - B&A will facilitate meetings with key City staff as needed to develop basic <br />components and planning of building program, including the City’s standard building systems, equipment <br />and materials. <br />1.16 External meetings - Attend coordination meetings with City staff and any pertinent external <br />agencies as required to determine and gain conceptual approval from all pertinent entities as required. <br />1.17 Permitting Strategy - B&A will develop a comprehensive permitting strategy and initiate discussions <br />with Building Permit Review offi cials on code issues / clarifi cations. <br />1.18 Submission - Prepare and submit six (6) sets and electronic format of Schematic Design Documents, <br />including specifi cation outline, cost estimates and schedule to the City staff for review and approval. <br />Phase 2 – Design Development <br />2.1 Design Development - The Team will prepare a design development submission. <br />2.2 Meetings - Facilitate meetings with City staff to develop Design Development Documents. If <br />agreed, B&A will meet to obtain sign-off. <br />2.3 Utilities - Coordinate with private utilities and service providers. <br />2.4 Testing - Conduct tests and investigations to prepare geotechnical reports necessary for the Design <br />Development. <br />2.5 Operation & Maintenance Plan - Update the preliminary Operation and Maintenance Plan and <br />cost estimate for proposed improvements. <br />2.6 Submittal - Prepare and submit six (6) sets and electronic format of Design Development Documents <br />to the City staff for review and approval. <br />2.7 Revisions - Respond in writing to all City comments. Revise/submit fi nal Design Development <br />Documents. <br />CONTINUING PROFESSIONAL A RCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY (CCNA) <br />RFQ NO. 12-04-02 <br />APPROACH & METHODOLOGY <br />52
The URL can be used to link to this page
Your browser does not support the video tag.