Laserfiche WebLink
Victor Goykhman <br />Executive Vice President / Electrical <br /> <br /> <br />Mr. Goykhman is Vice President of SGM Engineering with 38 years of Electrical <br />Engineering experience, including 22 years in the consulting field. Mr. Goykhman’s <br />responsibilities include QA/QC portion of electrical design and project management. <br />Mr. Goyk hman reviews all design documents before being issued to the contractor <br />for permitting and pricing. Mr. Goykhman has extensive experience with electrical <br />renovations, alterations and additions for existing higher education facilities. <br /> <br />Mr. Goykhman has a very sound working knowledge of Electrical Systems including <br />educational, health care, communications, video, computer networking, fire smoke <br />detection and alarm, emergency power and many other systems critical to large, <br />modern facilities. Mr. Goykhman’s extensive experience allows him to be an <br />excellent designer of power and lighting networks for all types of facilities. Mr. <br />Goykhman has been managing design teams at SGM for over twenty years. These <br />design teams have worked on projects for all types of facilities, including university <br />campuses, institutional, educational and other types of commercial facilities. His <br />experience allows him to establish the goals for a project and the necessary means <br />to accomplish cost effective, innovative solutions. Mr. Goykhman has been heavily <br />involved in scheduling and cost analysis of all types of projects. Mr. Goykhman’s <br />practical experience results from working closely with contractors and from <br />reviewing scheduling and cost information enabling SGM Engineering to provide <br />accurate timely data to our clients. <br />Project Experience <br />Ongoing, Town of Palm Beach Street, Street Lighting, Town of Palm Beach, <br />FL – Mr. Goykhman is an Electrical Engineer for this project. SGM was responsible <br />for the replacement and relocation of 46 street light that currently serve Dunbar Rd. <br />to Sunrise Ave. SGM coordinated with their facilities maintenance staff to <br />understand their needs, standards, determine a realistic schedule for the <br />design/engineering effort, meeting notes, probable construction cost estimate and <br />finally obtained technical cut sheets of equipment desired such that aesthetic <br />uniformity was achieved in the type of light pole/fixture installed. SGM engineers <br />visited the various project locations to obtain existing data related to pole locations <br />and sidewalk conditions. This effort will also constitute SGM to provide full <br />Construction Administration services for the one and one-half months construction <br />(1.5 months) schedule desired by the Town of Palm Beach. Upon completion of the <br />construction, SGM is responsible for implementing the As-Built drawings and <br />delivering the record set to the Town as a CD and a hard copy 11x17 set of <br />documents. <br />On-Going, Flagler County Courthouse Annex Sherriff’s Department <br />Renovations and Energy Efficient Upgrades, Bunnell, FL – Mr. Goykhman is <br />providing electrical design services the renovations to accommodate the needs of <br />the sheriff’s operations. Renovations include the following: Add fire sprinkler <br />system, replacement of the main fire alarm panel, repair exterior windows, confirm <br />fire rated separation between Historic Courthouse and Annex, replace A/C <br />ductwork, VAV units and controls, provide a ducted return system, test and balance <br />the new system, replace all lighting with energy efficient fixtures and lighting <br />controls, replace electrical power distribution system, new communications data <br />and technologies equipment, renovate all restrooms to ADA standards, replace all <br />suspended acoustical ceilings and grid with new efficient acoustic values, replace <br />all water heaters with energy efficient units. <br />2010, City of Orlando Events Center Parking Garage, Orlando, FL – Mr. <br />Goykhman provided electrical design services for this $34 million parking structure <br />which serves the needs of the Orlando Events Center. Nestor provided systems <br />designs for the garage’s CCTV high resolution video camera surveillance system <br />on all levels at strategic points of access. The design also included access control <br />through the use of proximity card scanners at selected door locations. Fire alarm, <br />area of rescue, emergency phone system, ticket dispensers, toll gates, and <br />communication systems were also include as part of the systems design. The <br />systems design incorporated local and remote monitoring of all systems. <br />YEARS EXPERIENCE: 38 <br />With SGM since 1991 <br /> <br />EDUCATION <br />Electrical Engineering <br />Degree <br />Polytechnic University <br />Uzbekistan, 1971 <br /> <br />