Justin Mundell, PE
<br />Electrical Engineer
<br />
<br />2010 Orange County Fire & Rescue, Fire Station #35, Orlando, FL – Mr. Mundell was an Electrical Engineer on this
<br />project. SGM developed the owners OPR documents, reviewed drawings during construction, developed the
<br />commissioning plan, attended construction meetings, witnessed equipment start up, performed functional performance tests
<br />on the equipment and provided Test & Balance services. Commissioning procedures were performed following the ACG
<br />guidelines and the requirements of LEED.
<br />2010, City of Orlando Events Center Parking Garage, Orlando, FL – Mr. Mundell provided electrical design services for
<br />this $34 million parking structure which serves the needs of the Orlando Events Center. Justin provided systems designs for
<br />the garage’s CCTV high resolution video camera surveillance system on all levels at strategic points of access. The design
<br />also included access control through the use of proximity card scanners at selected door locations. Fire alarm, area of
<br />rescue, emergency phone system, ticket dispensers, toll gates, and communication systems were also include as part of the
<br />systems design. The systems design incorporated local and remote monitoring of all systems.
<br />2010, Orlando Science Center HVAC, Lighting, Power, Plumbing & Fire Protection Energy Assessment, Orlando, FL
<br />– Mr. Mundell was an Electrical Engineer commissioned to provide engineering services to identify and recommend the best
<br />and most economical and energy efficient method of correcting the HVAC equipment located at the Orlando Science Center
<br />Complex. Responsibilities included: operation and the deficiencies associated with the operation. Inspect the facilities in
<br />areas of HVAC, lighting, power, Fire Alarm, security system, Plumbing & FP system. Review the as-build and compare with
<br />actual conditions to learn more about the operation. Attend meetings with MRI, City PM and owner’s rep to coordinate the
<br />activities and review SGM’s findings. Identify all the deficiencies associated with building’s HVAC, lighting, power, fire alarm,
<br />plumbing & FP systems. Provide a break down and inspection report including executive summary outlining the cost and
<br />improvement plan for the building operation.
<br />2010, Orange County Convention Center Variable Frequency Drive Controls and Energy Management, Orlando, FL –
<br />Mr. Mundell was an Electrical Engineer for the new Variable Frequency Drives and Controls for all existing air handling units,
<br />fan, blowers and secondary chilled water pumps for this 4,200,000 SF facility, the second largest convention center in the
<br />nation. Justin’s responsibilities included design of new controls, energy management system in compliance with codes,
<br />development of specifications, and sequence of controls.
<br />2010, Orange County Government District 9 Medical Examiner’s Office Facility, Orlando, FL – Mr. Mundell was an
<br />Electrical Engineer for the District Nine Medical Examiner’s Office which is a 41,283 SF facility that consists of three
<br />separate buildings: Medical Examiner’s Office, Morgue and Decomposition Morgue. The building is one of the first green
<br />Medical Examiner’s offices in the nation. This LEED Certified building will reduce its water consumption by 40 percent in one
<br />year with the use of low-flow fixtures and native landscaping.
<br />2007, City of Titusville, Fire Command Center, Titusville, FL – Mr. Mundell was an Electrical Engineer for the building
<br />assessment report regarding the MEP conditions of the City of Titusville’s Fire Command Center. SGM determined and
<br />identified current issues for life safety, ADA, HVAC, IAQ and power/electric systems. SGM also prepared cast estimates for
<br />associated deficiencies that were outlined in the report. The City utilized the report to request funding based on the findings.
<br />2007, Orange County Corrections Central Utility Plant Chiller Expansion, Orlando, FL – Mr. Mundell provided electrical
<br />design services for the existing central chiller plant which was required to meet the campus HVAC needs. Additionally, Mr.
<br />Mundell provided designs for the upgrade of the building electrical and lighting systems.
<br />2007, City of New Port Richey Recreation and Aquatic Center, New Port Richey, FL – Mr. Mundell provided electrical
<br />design services for the renovation of the thirty-seven year old existing recreation center and addition of a new 37,000 SF
<br />complex with a gymnasium, locker rooms, fitness center and meeting rooms. Exterior lighting was added for the outdoor
<br />tennis courts, parking lots, basketball courts, shuffleboard courts, and walking trails.
<br />
|