Laserfiche WebLink
Melissa R. Ross, MSCE <br />acne BNC3INEENINL7 ��L. Principal -in- Charge <br />Education: Master of Civil Engineering, Florida International University Miami, FL, 2001 <br />Bachelor of Civil Engineering, Florida International University, Miami, FL, 2000 <br />Registrations: Engineering Intern, Florida, License # 1100006677 <br />Professional Affiliations: American Society of Civil Engineers <br />Florida Engineering Society <br />Training Certifications: Ad -ICPR H &H Modeling Training, 2001 <br />Haestad Methods WaterCad Training, 2002 <br />Haestad Methods StormCad Training, 2004 <br />Professional Experience: Ms. Ross is a Principal with the firm and has over 13 years of <br />experience in land development, utility engineering, water and <br />wastewater treatment, drainage, roadway design, and permitting. <br />She has worked with many clients in the public and private <br />sectors. Ms. Ross also has extensive field experience in <br />construction. <br />Project Experience: <br />Miami Dade Water and Sewer Department <br />Small Diameter Contract Ms. Ross was the <br />Construction Engineering Manager for this <br />project with Miami Dade County. The scope of <br />work for this project included a detailed <br />manholes cleaning and inspection, pump station <br />wet well cleaning and inspection, sewer gravity <br />main cleaning and CCTV inspection. This <br />project was the first of a two step process to <br />reduce 1 /1. In accordance with MDWASD's <br />guidelines, the project helped identify specific <br />repairs through the manhole, pump station, and <br />CCTV inspections. The second portion of the <br />project included the repair of the identified <br />defects that was recorded on Miami Dade's <br />database and report that was discussed at the <br />monthly meetings. <br />City of North Miami Basin 5 Drainage <br />Improvements, City of North Miami, Florida <br />Assisted the project Engineer for best <br />management practices for water quality and <br />flood mitigation for Basin 5's flooding problems. <br />Helped design a detailed hydrologic analysis of <br />the city of North Miami Basin's #5 and an <br />extensive hydraulic analysis of existing and <br />proposed stormwater pump station structures. <br />The scope of work for the hydraulic rating <br />analysis included analyzing two existing pump <br />stations on NE 14th Avenue and 136th Avenue <br />(existing FLYGHT Pumps) included developing <br />system and pump curves to approximate <br />deficiencies. New pump stations were proposed <br />to accommodate much larger volumes of runoff <br />from increased development upstream. <br />City of Doral Stormwater Master Plan, City of <br />Doral, FL Assisted with the data collection of <br />underlying soil properties within the watershed. <br />Assisted in the review of the existing soil data <br />from the Soil Survey of Collier County published <br />by the United States Department of Agriculture <br />(USDA) Soil Conservation Services, Miami - <br />Dade GIS System, and the SFWMD DB- <br />HYDRO, In addition, we reviewed the geologic <br />and topographic information from appropriate <br />Quadrangle Maps published by the United <br />States Geological Survey (USGS) and other <br />reliable data. <br />The School District of Palm Beach County <br />Civil Engineering Services on Continuing <br />Contract - Sunrise Park Elementary School, <br />Boca Raton, FL - Sunrise Park Elementary <br />School Driveway Realignment was a task work <br />E <br />