Laserfiche WebLink
i19 <br />Irl <br />CITY OF SUNNY ISLES BEACH <br />(j Intersection and Corridor Analysis: Mr. Calderon has performed <br />multiple intersections and corridors analyses using the latest Highway <br />7 Capacity Software or SYNCHRO 8 and VISSIM. Traffic Signal <br />operations will be retrieved from the Miami -Dade County traffic signal <br />(� system. The intersection and corridor analysis will address: the impact <br />of geometric improvements, the existing and future intersection LOS, <br />(� interval and phasing timing optimization, new signal timing plans, fuel <br />consumption over benefits like reductions in control delay and <br />[� accident numbers or severity, as well as, community response among <br />each alternative. <br />A latest project lead by Mr. Calderon regarding intersection <br />[ ] and corridor analysis is the review of Bayfront's <br />Transportation Improvement Plan FMN: 22090116, City of <br />j Long Boat Key (2009- 2010): This project provided Long <br />Range Transportation Plan (LRTP) FSUTMS modeling in <br />[) Cube for current and future alternatives; roundabouts and <br />intersections along the US -41 corridor were proposed in the <br />[� future condition; VISSIM was used for detailed operation <br />simulation modeling; SYNCHRO was used for signal timing <br />[ ] and Field gap acceptance data. Recommendations were <br />prepared based on alternatives comparison. Contact: City of <br />!� Long Boat Key, Juan J. Florensa (941) 316 -1988 <br />7 <br />CALTRAN <br />ENGINEERING GROUP <br />Safety Technical Memorandums: Mr. Calderon has full access to FDOT CAR database (State <br />[� Roads crash data) and is familiar with resolving issues such as analysis of data presented from local <br />police departments. In addition, our staff is trained to determine discrepancies with the accident data <br />i [ provided by police officers that may require corrections or better examination. Furthermore, the team <br />engineers have participated reviewing and trained in the new Highway Safety Manual. <br />A latest project lead by Mr. Calderon regarding Safety <br />L Technical Memorandums was the FDOT District 6- 3R- <br />Scoping Reports NW 12th Avenue & NW 47th Avenue: <br />This project included a safety study involving the <br />widening of the street to offer additional lanes in each <br />direction along NW 47th Avenue/NW 183rd Street to <br />NW 215th Street. Additionally a safety study for project <br />involving the resurfacing along NW 12th Avenue/NW <br />29th Street to NW 40th Street. Contact: FDOT D6 — <br />i Jennifer Barrow 305- 470 -5382 /Burns & McDonnell- <br />Jeannelia Liu, P.E. &. Carlos Perez, P.E. (305)648 -3387 <br />81 Page <br />