Laserfiche WebLink
1"] <br />[A- <br />]G.BxnsTA <br />& ASSC CIATES <br />DESIGN <br />15 OO <br />The next step in our methodology is the actual design which includes the elements reviewed and <br />developed during the initial strategizing. This step is the most technical since it involves the <br />maximum use of our engineering skills and the use <br />of our cutting edge tools for an optimal design <br />The entire process of MEP planning and design <br />requires not only imagination and conceptual <br />thinking but also sound knowledge of practical <br />aspects, such as recent design codes and statutes, <br />backed up by ample experience, intuition and <br />engineering judgment. <br />It is emphasized that any structure to be constructed <br />must satisfy the need for efficiency for which it is intended and shall be durable for its desired life <br />span. Thus, the MEP design of any structure is categorized into following two main types: <br />1. Functional design <br />2. MEP design <br />l FUNCTIONAL DESIGN: The most important function of the MEP design is to support the use of the <br />structure for its intended use. Depending on the structures use, the MEP design will vary <br />significantly. This is why it is extremely important during the Strategy phase to define in detail the <br />functions and use of each component of the proposed facility. <br />�i <br />MEP DESIGN: Once the functions have been properly defined, then it is up to the professional to <br />properly engineer the facility to support the use. <br />The process of the Mechanical/Plumbing _Engineering involves the following stages: <br />1. Study the architectural plans in order to obtain the necessary data to provide the Load <br />Calculations. The engineer must have received feedback from the owner as to his specific <br />requirements for environmental comfort or even for unique temperature requirements for <br />special equipment. <br />2. Institute energy saving measures in the design. <br />3. Coordinate with other design professionals for conflicts. <br />4. Specify equipment and materials that are within the owner's budgetary constraints. <br />5. Detail, drawings and preparation of construction documents. <br />6. Provide Quality Control and corrections as may be needed. <br />CITY OF SUNNY ISLES BEACH <br />RFQ No. 12 -04 -01 <br />