My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-01) Professional Architectural and Engin. Svcs - Individulas Only CCNA
>
Responses
>
G. Batista 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 2:37:03 PM
Creation date
6/12/2012 2:22:39 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs. Individuals
Bid No. (xx-xx-xx)
12-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. BATISTA <br />R&ASSOCIATES <br />17@ <br />process whereby we support the contractor in the proper execution of the project from start to <br />finish. These items are: <br />1. Providing the client /contractor with a full set of documents as agreed with transmittals. <br />2. Coordinating and instituting the RFI system with the contractor and client. <br />3. Coordinating and instituting a submittal and shop drawing submission and approval process. <br />4. Coordinating site visits and inspections with the client /contractor. <br />5. Coordination for attendance of construction weekly meetings (if required by client or <br />contractor). <br />6. "Migration" also includes successfully closing out the project at the time of construction <br />completion. These items include: <br />a. Oversee final inspections <br />b. Approval of close -out documents such as warranties and manuals of operation. <br />c. Assist the client and contractor with obtaining the Certificate of Occupancy if <br />applicable. <br />d. Coordinate with the contractor in order to provide the required as- builts. <br />e. Provide other assistance to the contractor as may be needed. <br />BUILD <br />"Build" is the only process that we have no control over but have included it in the "Method Sphere" <br />as the ultimate last step in the standard progression of the design process. <br />OVERALL ORGANIZATION TO COMPLETING PROJECTS <br />Greg Batista, PE, CGC, LEED AP, CEM is the engineer that is in responsible charge of all the <br />designs and projects that he and his company perform whether it's an inspection, a Structural or MEP <br />design. Our success, even during these hard economic times, has been mostly due to the non - <br />compromising implementation of our afore - mentioned <br />"Method Sphere" tactic for completing our engineering tasks. <br />The overall organization that is employed to attack a given <br />engineering task revolves around the first step which is the <br />"Strategy ". It is during this initial and critical phase that we <br />-_ assess the scope of work and apply the appropriate resources <br />- for its successful and timely completion. Through the years, <br />Mr. Batista has been able to amass a pool of talent that are <br />both full -time employees as well as hired consultants. <br />CITY OF SUNNY ISLES BEACH <br />RFQ No. 12 -04 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.