My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-01) Professional Architectural and Engin. Svcs - Individulas Only CCNA
>
Responses
>
G. Batista 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 2:37:03 PM
Creation date
6/12/2012 2:22:39 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs. Individuals
Bid No. (xx-xx-xx)
12-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G G. BATISTA <br />& ASSOCIATES <br />18 0 <br />The ability to meet timelines and deadlines has a direct correlation to the availability of resources to <br />employ to the given task. Upon embarking on the "Strategy" we assess the amount of resources <br />required to successfully complete the task within the time given. The resources include the amount of <br />personnel, the time allotted to each person for each task, and also the equipment, software, and <br />materials required. We have an ample office in Cooper City for the past 6 years with all the <br />equipment required to conduct efficient engineering business. Additionally, Mr. Batista's employees <br />are ready, willing and able to perform and support Mr. Batista in his duties, and our extensive <br />network of hired and seasoned consultants are always at hand to supplement our forces when time <br />constraints require it. <br />SPECIFIC STRENGTHS <br />Individual Strengths in Particular Projects: <br />PARKING GARAGES <br />Greg Batista has been on both sides of the fence in the construction of parking garage structures <br />j <br />handling both the design and the building using various methods such as cast -in -place and the more <br />widely -used precast methods. There are very few people in the industry that have this level of <br />experience in knowing the intricacies of successfully designing and building a parking garage <br />structure. <br />PROJECT: Doral Concourse I Parking Garage <br />LOCATION: Doral, Florida <br />3 <br />DESCRIPTION: 350,000 square foot pre -cast Parking Garage Structure <br />CAPACITY: Greg Batista was the Project Manager in charge of both the designing and <br />building of this pre -cast parking facility. <br />CITY OF SUNNY ISLES BEACH <br />RFQ No. 12 -04 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.