Laserfiche WebLink
ACADEMIC <br />BACKGROUND <br />M.S., Environmental <br />Engineering, Pennsylvania <br />State University, 2001 <br />B.S., Civil Engineering <br />Pennsylvania State <br />University, 1990 <br />PROFESSIONAL <br />REGISTRATION <br />Registered Professional <br />Engineer, FL #63171, <br />PA #048718E, <br />AL #29062 -E, <br />MS #18259, <br />GA #033059 <br />PROFESSIONAL <br />AFFILIATIONS <br />American Society of Civil <br />Engineers <br />National Society of <br />Professional Engineers <br />Florida Society of <br />Professional Engineers <br />Florida Engineering Society <br />Society of American <br />Military Engineers <br />Mr.Tomczyk has more than 22 years of general civil engineering experience, with a specialty in Land <br />Development, stormwater management, floodplain modeling, permitting and private development <br />engineering and construction administration. He has extensive experience with the design/ <br />implementation of grant funded public and quasi - public entities in the generation of technical <br />specification and grant management.Additionally, Mr.Tomczyk has been utilized as an expert witness <br />for courtroom testimony for land use and stormwater management/floodplain management issues. <br />Mr. Tomczyk has also provided engineering and support services for federal, public and private <br />clients for residential, industrial, and institutional development. Key services include structural, <br />land development site plan /engineering preparation, development feasibility study, subdivision <br />design, roadway design, stormwater management , floodplain and riparian engineering, grading <br />(earthworks), drainage and erosion control, road design, traffic improvements , environmental <br />design and restoration, construction specification, commissioning, and procurement of all local, <br />county, state and other governmental approvals. <br />RELEVANT EXPERIENCE <br />VILLAGE OF CANAL POINT SANITARY SEWER IMPROVEMENTS, CITY OF PAHOKEE, <br />PALM BEACH COUNTY, FL: Supervising Engineer for the design of low pressure sewer system <br />within the Village to replace malfunctioning septic systems. The low pressure system consisted of <br />68 grinder pumps and 2 lift stations that tied into the existing City sanitary system.The system was <br />permitted by the County of Palm Beach and the Florida DEP.The project was funded through a Joint <br />Partner Agreement 0PA) with the USDA, Palm Beach County and the City of Pahokee. <br />COUNTESS HOERNLE PARK IDC, CITY OF BOCA RATON, FL: Project Manager /Civil <br />Engineer for a contract providing comprehensive project management and full turnkey consulting <br />services for the development of a 228 -acre park.The City completed a preliminary Master Plan <br />in early 2006 for the entire site.The overall scope of services for the park development includes <br />the following: project management; survey; geotechnical; environmental; landscape architecture/ <br />land planning; reclaimed water; civil engineering; architecture; mechanical /electrical engineering; <br />structural engineering; permitting; bidding and construction. This project includes the design of the <br />Phase I Master Plan components for the South Site, comprising approximately 171- acres, to satisfy <br />the City's immediate need for softball and soccer playing fields, while being environmentally and <br />culturally innovative. Fees: $500K, (2006 to 20 10) <br />MONROE COUNTY EAR, COMPREHENSIVE PLAN UPDATE AND LAND <br />DEVELOPMENT CODE RE- WRITE, MONROE COUNTY, FL: Monroe County has <br />contracted with Keith and Schnars to update their Comprehensive Plan Policy and Technical <br />Documents to the 2010 -2030 planning timeframe; the last update occurred in 1995. Keith and <br />Schnars is also providing services to prepare the EAR for the County. Monroe County's current <br />regulations were drafted in 1985 and have been appended numerous times over the years.The goal <br />of this project is to realign the LDR sections to make it more user friendly, incorporate modern <br />planning strategies, and implement the Goals, Objectives and Policies of the Comprehensive Plan. <br />Mr. Tomczyk is responsible for analyses of potable water, sanitary sewer, and drainage. Client/ <br />Contact: Monroe County BOCC /Christine Hurley, Phone: (305) 289-2517.(12/09 to Present) <br />7TH SPECIAL FORCES GROUP COMPLEX, US ARMY CORPS OF ENGINEERS, <br />MOBILE DISTRICT, DUKE FIELD, EGLIN AFB, FL: Project Manager and Lead Civil Design <br />Engineer responsible for providing site /civil design of a new military complex to house the 7th <br />Special Forces Group, relocated from Fort Bragg to Eglin Air Force Base. Providing site /civil design <br />services for three architects designing a complex of buildings and infrastructure systems, which <br />includes headquarters buildings, barracks, vehicle maintenance buildings, a dining facility, recreation <br />and training facilities, and several support buildings. Project includes 25 buildings, including the a <br />Munitions Complex, Combat Readiness Training Facility, and aTactical Communications Facility, on a <br />campus -type setting of approximately 175- acres. Responsible for site /civil components, specifications <br />and quality control for the Logistics Complex and the GSB Tactical Equipment Maintenance Facility. <br />The site work includes grading, utilities, erosion control, permitting, and related work. Project is <br />being conducted in conjunction with the USACE Mobile District civil staff which is designing the <br />entrance and perimeter roads, as well as the stormwater management system Construction Cost: <br />$300M, (2006 to 2010) <br />RFQ # 12 -04 -05 PAGE 13 <br />KEITH and SCHNARS, P.A. <br />FLORIDfiN Sit LOCAL FIRM <br />