ACADEMIC
<br />BACKGROUND
<br />B.S., Civil Engineering
<br />Auburn University, 1986
<br />PROFESSIONAL
<br />REGISTRATION
<br />Registered Professional
<br />Engineer, FL #43447
<br />J KEITH and SCHNARS, P.A.
<br />FLOR[11 3 & ocAL FIRM
<br />Mr.Wilson has 26 years of experience in the design and management of highway transportation projects
<br />in Florida and South Carolina. Mr. Wilson joined the consultant industry in 1994 after 9 years with
<br />the FDOT. His design experience encompasses complete project plans preparation and development
<br />including roadway design, traffic operations, drainage, pavement design, environmental permitting and
<br />utility coordination for a multitude of projects including RRR.
<br />RELEVANT EXPERIENCE
<br />ANDREWS AVENUE EXTENSION — SEGMENT 5, FPID: 230724- 1 -32 -0, BROWARD
<br />COUNTY, FL: Project Manager for the design and permitting the construction of a 0.5 mile new
<br />4 -lane divided roadway from Racetrack Road to Atlantic Boulevard in Pompano Beach, Florida. Includes
<br />the design and permitting of a new closed storm drainage system and retention pond system, two
<br />signalized intersections, signing and marking plans, landscape plans, and a new roadway lighting system.
<br />Client/Contact: FDOT District 4 /Anson Sonnett, P.E. Phone: (954) 777 -4474, email:William.Sonnett@
<br />dot.state.fl.us . (5/ 10 to present)
<br />SR- 713 /KINGS HIGHWAY RRR, FPID: 422957- 1- 32 -01, ST. LUCIE COUNTY, FL:
<br />Milling & Resurfacing of a 2 -mile section of SR -713 /Kings Highway in St. Lucie County from Indrio
<br />Road to Spanish Lakes Boulevard. SR -713 is a rural 2 -lane roadway with paved shoulders and swale
<br />drainage.The project also involved widening design for a new left turn lane, signalization upgrades
<br />ADA ramp improvements, signing and marking, sidewalk construction, drainage modifications, utility
<br />coordination, permitting and landscaping. Client/Contact: FDOT District 4 /Nadir Rodriguez, RE..,
<br />Phone: (954) 777 -4385, email: nadir.rodriguez @dot.state.fl.us. (12/08 to Present)
<br />I -95 -SFRC SOUND BARRIERWALLS DESIGN- BUILD, BROWARD, COUNTY, FL: Design
<br />project Manger for desing build team tasked with design, permitting and construction of 3,500 -ft
<br />of 21 -ft high noisewall adjacent to the South Florida Rail Corridor (SFRC) and 1 -95. The project
<br />included overhead and underground utility coordination and development of avoidance strategies.
<br />Also designed the reconstruction of adjacent Lone Pine Lane and developed construction staging
<br />plans that minimized impact to adjacent trailer park residents. Responsible for all environmental,
<br />drainage and rail corridor permitting. Client/Contact: FDOT District 4 /Leslie Wetherell, P.E. Phone:
<br />(954) 777 -4438, email: leslie .wetherell @dot.state.fl.us. (1 1 /06 to 7/07)
<br />ANDREWS AVENUE EXTENSION - SEGMENTS 2 AND 3, FPID: 230622- 1 -32 -01 &
<br />230725- 1- 32 -01, BROWARD COUNTY, FL: Keith and Schnars designed and permitted the
<br />construction of a 1.5 mile new 4 -lane divided roadway from Atlantic Boulevard to NW I Oth Street.
<br />This portion of the project included the design of a grade separated bridge crossing of Andrews
<br />Avenue over the CSX rail corridor and Martin Luther King Jr. Boulevard.Also included were the design
<br />and permitting of a new closed storm drainage system and retention pond system, four signalized
<br />intersections, signing and marking plans, landscape plans, and a new roadway lighting system. Client/
<br />Contact: FDOT District 4 /Donovan Pessoa, P.E. Phone: (954) 777 -4442, email: donovan.pessoa @dot.
<br />state.fl.us. (12/02 to 8/05)
<br />TRI -RAIL DOUBLE TRACKING PROJECT: Design Project Manager responsible for the
<br />production of construction documents for the track corridor drainage and site grading design as
<br />well as roadway grade crossing designs for all 72 at -grade rail crossings within the 44 -mile Segment
<br />5 corridor. All design was developed to FDOT design criteria and all plans produced followed FDOT
<br />CADD guidelines. The project scope involved storm drainage, roadway grade crossing plans, striping
<br />plans, signal plans, as well as utility coordination, permitting and specifications preparation. Contact:
<br />Dan Mazza, SFRTA, Phone: (954) 788 -7893. (8/01 to 4/06)
<br />CROSSTOWN PARKWAY /I -95 INTERCHANGE, ST. LUCIE COUNTY, FL: Senior Designer
<br />directing project design staff involved in development and preparation of roadway construction
<br />documents including roadway plans, storm drainage, traffic control plans, signing and pavement marking
<br />plans, signal plans, and specifications. Also assisted the Project Manager with the development the
<br />Preliminary Engineering Report, drainage reports, permitting and day -to -day coordination between
<br />the FDOT, City of Port St. Lucie and multiple Developers.The project scope involved construction
<br />of a new tight diamond interchange connecting Crosstown Parkway (Previously called West Virginia
<br />Drive) to 1 -95. Clients /Contact: City of Port St. Lucie /Roxanne Chesser, P.E. Phone: (772) 871 -5186,
<br />email: RoxanneC @cityofpsl.com. FDOT District 4 Coordination /Leslie Wetherell, P.E. Phone: (954)
<br />777 -4438, email: leslie .wetherell @dot.state.fl.us. (6/04 to 5/07)