Laserfiche WebLink
ACADEMIC <br />BACKGROUND <br />B.S., Civil Engineering <br />Auburn University, 1986 <br />PROFESSIONAL <br />REGISTRATION <br />Registered Professional <br />Engineer, FL #43447 <br />J KEITH and SCHNARS, P.A. <br />FLOR[11 3 & ocAL FIRM <br />Mr.Wilson has 26 years of experience in the design and management of highway transportation projects <br />in Florida and South Carolina. Mr. Wilson joined the consultant industry in 1994 after 9 years with <br />the FDOT. His design experience encompasses complete project plans preparation and development <br />including roadway design, traffic operations, drainage, pavement design, environmental permitting and <br />utility coordination for a multitude of projects including RRR. <br />RELEVANT EXPERIENCE <br />ANDREWS AVENUE EXTENSION — SEGMENT 5, FPID: 230724- 1 -32 -0, BROWARD <br />COUNTY, FL: Project Manager for the design and permitting the construction of a 0.5 mile new <br />4 -lane divided roadway from Racetrack Road to Atlantic Boulevard in Pompano Beach, Florida. Includes <br />the design and permitting of a new closed storm drainage system and retention pond system, two <br />signalized intersections, signing and marking plans, landscape plans, and a new roadway lighting system. <br />Client/Contact: FDOT District 4 /Anson Sonnett, P.E. Phone: (954) 777 -4474, email:William.Sonnett@ <br />dot.state.fl.us . (5/ 10 to present) <br />SR- 713 /KINGS HIGHWAY RRR, FPID: 422957- 1- 32 -01, ST. LUCIE COUNTY, FL: <br />Milling & Resurfacing of a 2 -mile section of SR -713 /Kings Highway in St. Lucie County from Indrio <br />Road to Spanish Lakes Boulevard. SR -713 is a rural 2 -lane roadway with paved shoulders and swale <br />drainage.The project also involved widening design for a new left turn lane, signalization upgrades <br />ADA ramp improvements, signing and marking, sidewalk construction, drainage modifications, utility <br />coordination, permitting and landscaping. Client/Contact: FDOT District 4 /Nadir Rodriguez, RE.., <br />Phone: (954) 777 -4385, email: nadir.rodriguez @dot.state.fl.us. (12/08 to Present) <br />I -95 -SFRC SOUND BARRIERWALLS DESIGN- BUILD, BROWARD, COUNTY, FL: Design <br />project Manger for desing build team tasked with design, permitting and construction of 3,500 -ft <br />of 21 -ft high noisewall adjacent to the South Florida Rail Corridor (SFRC) and 1 -95. The project <br />included overhead and underground utility coordination and development of avoidance strategies. <br />Also designed the reconstruction of adjacent Lone Pine Lane and developed construction staging <br />plans that minimized impact to adjacent trailer park residents. Responsible for all environmental, <br />drainage and rail corridor permitting. Client/Contact: FDOT District 4 /Leslie Wetherell, P.E. Phone: <br />(954) 777 -4438, email: leslie .wetherell @dot.state.fl.us. (1 1 /06 to 7/07) <br />ANDREWS AVENUE EXTENSION - SEGMENTS 2 AND 3, FPID: 230622- 1 -32 -01 & <br />230725- 1- 32 -01, BROWARD COUNTY, FL: Keith and Schnars designed and permitted the <br />construction of a 1.5 mile new 4 -lane divided roadway from Atlantic Boulevard to NW I Oth Street. <br />This portion of the project included the design of a grade separated bridge crossing of Andrews <br />Avenue over the CSX rail corridor and Martin Luther King Jr. Boulevard.Also included were the design <br />and permitting of a new closed storm drainage system and retention pond system, four signalized <br />intersections, signing and marking plans, landscape plans, and a new roadway lighting system. Client/ <br />Contact: FDOT District 4 /Donovan Pessoa, P.E. Phone: (954) 777 -4442, email: donovan.pessoa @dot. <br />state.fl.us. (12/02 to 8/05) <br />TRI -RAIL DOUBLE TRACKING PROJECT: Design Project Manager responsible for the <br />production of construction documents for the track corridor drainage and site grading design as <br />well as roadway grade crossing designs for all 72 at -grade rail crossings within the 44 -mile Segment <br />5 corridor. All design was developed to FDOT design criteria and all plans produced followed FDOT <br />CADD guidelines. The project scope involved storm drainage, roadway grade crossing plans, striping <br />plans, signal plans, as well as utility coordination, permitting and specifications preparation. Contact: <br />Dan Mazza, SFRTA, Phone: (954) 788 -7893. (8/01 to 4/06) <br />CROSSTOWN PARKWAY /I -95 INTERCHANGE, ST. LUCIE COUNTY, FL: Senior Designer <br />directing project design staff involved in development and preparation of roadway construction <br />documents including roadway plans, storm drainage, traffic control plans, signing and pavement marking <br />plans, signal plans, and specifications. Also assisted the Project Manager with the development the <br />Preliminary Engineering Report, drainage reports, permitting and day -to -day coordination between <br />the FDOT, City of Port St. Lucie and multiple Developers.The project scope involved construction <br />of a new tight diamond interchange connecting Crosstown Parkway (Previously called West Virginia <br />Drive) to 1 -95. Clients /Contact: City of Port St. Lucie /Roxanne Chesser, P.E. Phone: (772) 871 -5186, <br />email: RoxanneC @cityofpsl.com. FDOT District 4 Coordination /Leslie Wetherell, P.E. Phone: (954) <br />777 -4438, email: leslie .wetherell @dot.state.fl.us. (6/04 to 5/07) <br />PAG E 14 RF Q# 12 -04 -05 <br />