|
ACADEMIC
<br />BACKGROUND
<br />M.S., Environmental
<br />Engineering, Florida
<br />International University,
<br />1995
<br />B.S., Civil Engineering
<br />Florida International
<br />University, 1992
<br />A.A., Miami -Dade College,
<br />1988
<br />PROFESSIONAL
<br />REGISTRATIONS
<br />Registered Professional
<br />Engineer, FL #55459
<br />Mr.Vilar has over 14 years of extensive professional experience in the design of water /wastewater
<br />systems, design of drainage and storm water management systems, site design and development,
<br />preparation of contract documents and specifications for bid and permitting services experience
<br />through numerous South Florida agencies. His experience includes design of water and wastewater
<br />improvements for the City of Fort Lauderdale, rehabilitation of lift stations in City of Coconut
<br />Creek and North Lauderdale, and neighborhood improvements for theWestgate CRA. Professional
<br />experience also includes work on various land development projects for Seminole Tribe of Florida,
<br />Coscan Homes and also administering the NPDES Program for the City of Miami.
<br />RELEVANT EXPERIENCE
<br />WATER AND WASTEWATER IMPROVEMENT PROJECT FOR LAUDERDALE WEST,
<br />SUNSET NORTH, RIVER RUN, FLAMINGO PARK, OAK RIVER, SHADY BANKS
<br />AND EDGEWOOD COMMUNITIES, BROWARD COUNTY, FL: Project Manager for
<br />the design of water and wastewater improvements for the City of Fort Lauderdale Water Works
<br />2011 Program.The service areas for these projects are comprised of a mixture of single family,
<br />multi - family, commercial, office and industrial uses.The design phase includes over 188,000 linear
<br />feet of gravity sewer, 20,300 linear feet of force mains, 16 new wastewater pump stations, and
<br />43,000 linear feet of water mains. The total construction value was estimated to be 30 million
<br />dollars. Client/Contact: City of Fort Lauderdale /Paul Bohlander, P.E., Phone: (954) 522 -2604. (1/03
<br />to present)
<br />SEWER STUDY FOR CHULA VISTA/RIVER LANDS /LAUDERDALE ISLE AND RIVER
<br />LANES COMMUNITIES, BROWARD COUNTY, FL: Project Manager for an engineering
<br />study to provide sanitary sewer systems to several residential communities which are being
<br />serviced by individual septic tank systems and recently annexed by the City of Fort Lauderdale.
<br />The study area comprised of 425 -acres of mostly single - family dwellings. The study identified
<br />and evaluated several options to service the subject communities.The recommended wastewater
<br />system includes 55,000 linear feet of gravity sanitary sewer collection systems, 7,000 linear feet of
<br />force mains and three (3) wastewater pump stations. The total construction value was estimated to
<br />be $10 million. Client/Contact: City of Fort Lauderdale /Paul Bohlander, P.E., Phone: (954) 522 -2604.
<br />(4/03 to 10/03)
<br />ALEXANDER TOWERS DRAINAGE IMPROVEMENTS, BROWARD COUNTY, FL:
<br />Drainage Improvements for an existing Condominium site in Hollywood, FL.The proposed work
<br />involved the elimination of an existing ocean outfall and modifying the sites existing drainage
<br />system to include an exfiltration trench system to meet water quality requirements and a drainage
<br />well to provide storm water attenuation.
<br />COCONUT CREEK LAKE BANK IMPROVEMENTS, BROWARD COUNTY, FL: The
<br />proposed improvements corrected deficient lake banks of four (4) existing lakes to the required
<br />permitted design conditions.The scope of work included preparation of Lake Improvement Plans
<br />and obtaining permitting agency approvals for the modifications.
<br />COCONUT CREEK LIFT STATION IMPROVEMENTS, BROWARD COUNTY, FL:
<br />Rehabilitation of Lift Station in the City of Coconut Creek, FL. Work included the modeling /analysis
<br />of the existing conditions of the lift station to determine the existing capacity of the wetwell
<br />and required pump sizing. Responsibilities also included permitting, bidding and negotiation and
<br />construction management.
<br />ACME BASIN B DISCHARGE PROJECT — SECTION 24 (COMPREHENSIVE
<br />EVERGLADES RESTORATION PLAN, CERP): Work entails design of an approximately
<br />410 -acre natural area (Section 24 Lands), with uplands, deep water and wetlands to provide flood
<br />attenuation and treatment prior to discharge to the C- I canal. Other project features include
<br />the design of conveyance improvements for the C- I canal. Responsibilities also included the
<br />management of the sub - consultant design for the design of two (2) storm water pump stations,
<br />and the seepage analysis design for Section 24. Client/Contact: South Florida Water Management
<br />District/Tommy Strowd, P.E., Phone. (561) 242 -5520 ext 4010.(1/03 to 10/06)
<br />: KEYM and SCEINARS, P.A.
<br />' FLORIDAS �% LOCAL FIRM
<br />RFC- #12 -04 -05 PAGE 15
<br />
|