My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br />L� <br />._J <br />Bruno Torres <br />Page 3 <br />3188 — 3k, Port of Miami, Miami, Florida. As an inspector overseeing Port roadway rehabilitation, Mr. Torres performed <br />inspection and materials testing. He performed maintenance of traffic inspection; reinforced earth walls inspection; earthwork and <br />subgrade inspection and updated associated density logbooks. <br />T�, <br />TARGET ENGINEERING GROUP, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.