My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />n <br />'I <br />J <br />Notice to Proceed (NTP): Target Engineering Group, in conjunction with the Project Manager, shall issue a <br />NTP only after there is an executed contract and the Contractor's insurance certificates, bank and <br />performance bonds, permits and necessary licenses have been verified and approved. <br />Preconstruction Orientation Meeting: After the NTP is issued and prior to the start of fieldwork, an <br />orientation meeting shall be held with the Contractor to introduce personnel, review contract administration <br />procedures, evaluate site conditions and examine the Request for Information (RFI's) process with the <br />Contractor. <br />Progress Payment Reports: At the Preconstruction Orientation Meeting, depending on the method of <br />accounting, either the pay item driven or lump sum, the Contractor and Sr. Project Engineer shall organize <br />monthly schedules as follows: <br />• Lump Sum Contracts — Based on the "Schedule of Values," the Contractor will fill out the monthly - <br />completed items and /or quantities as noted on the Monthly Progress Payment form. Then the Sr. <br />Project Engineer will verify monthly progress and cost amounts due the Contractor. If agreeable by <br />the Sr. Project Engineer, a signature sign -off shall follow and the progress payment form will be <br />forwarded to the County for their review and payment. <br />• Pay Item Contracts — Target's field personnel will record all work performed by the Contractor on a <br />Daily Report of Construction Form. The work will be tied back to the appropriate pay item and an <br />accumulated monthly estimate will be prepared, agreed upon by the Contractor and forwarded to the <br />County for payment. <br />Permitting: Verify all permits are obtained. Keep permit log to ensure no lapse or expirations. <br />Project Schedules: The Target Team will review and evaluate the following schedules submitted by the <br />Contractor: <br />• Detailed Construction Schedule <br />• Milestone Schedule <br />• Manpower Schedule <br />• Cash Flow Schedule <br />• Submittal Schedule <br />• Project Master Schedule <br />• Change Impact Schedule <br />• Recovery Schedule <br />• Short Term Schedule <br />Contractor Coordination Meetings: To coordinate the contractor effort and review the progress, weekly <br />meetings shall be conducted by the Target Team. The agenda shall consist of but not be limited to: <br />• Past issues still requiring resolutions, <br />• New problems requiring resolutions, <br />• Requests for information, <br />• Non Conformance Reports (NCR's), <br />• Access, <br />Target Engineering Group, Inc. <br />Page 11 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.