My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t. <br />Pre - Construction <br />Public Information Initiatives <br />Timeframe <br />• Develop a Public Information / Liaison Program and Initial Plan, also <br />known as also known as a Community Awareness Plan (CAP): <br />The PIO will conduct extensive research on the municipality and local <br />community throughout the project limits, review project plans and generate a <br />detailed outreach plan based on the potential impacts that were determined <br />during the initial project research. <br />Additional project details will be identified such as, adjacent <br />project /developments, key stakeholder contact information, special events <br />Approx. 1 to <br />calendar, past community outreach activities, mass transit impacts, traffic flow <br />3 months <br />3 mths <br />impacts, residential and commercial access, vehicular movement and <br />before start <br />pedestrian access, and solutions to these potential impacts to the community. <br />date <br />This plan will be used as a guide to notify and coordinate any required <br />meetings or outreach with the affected stakeholders prior to and throughout the <br />duration of the project. <br />Project personnel will also use this plan as a tool to foresee potential impacts, <br />therefore providing the PIO with advanced warning on any project activities <br />for immediate public /stakeholder notification. <br />• Produce written collaterals and project web site development: <br />Collaterals such as the project fact sheet, press releases, official letter and <br />routine construction alerts will all be drafted at least three weeks prior to the <br />construction start date and as deemed necessary throughout the project. These <br />materials will be used to distribute to the public and media via door -to -door <br />hand out, mass emails, mailers, community meetings and web sites while <br />Approx. 1 <br />construction is underway. <br />month prior <br />to start date <br />In addition, a project web site can be created and maintained by the PIO with <br />detailed project information, lane closures, anticipated work schedules, contact <br />information and additional pertinent details regarding the project. This web <br />site will be a resource for residents and stakeholders to obtain up -to -date <br />project information 24 hour / 7 days a week. <br />• Plan and Attend Pre - Construction Meeting: <br />The PIO along with the Construction team will plan and execute a community <br />Approx. 1 <br />Pre - Construction Kickoff Public meeting prior to the project commencing. A <br />month prior <br />project presentation will be presented to attendees outlining the proposed <br />to start date <br />improvements, phases of construction, potential impacts, contact information, <br />etc. <br />Target Engineering Group, Inc. <br />Page 14 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.