My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Target Engineering C8x09 Tow 10 1 Interval.txt <br />other means. 4 <br />6. Prepared written communications in the form, format, and <br />details required by CPAM,etc. & within the appropriate time frame 4 <br />Comm. Total 24 / Number of Tests 6 X0.12 = Communication GRADE: 0.48 <br />Notes: <br />+------------------------------------------------------------------------- - - - - -+ <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 Screen 8 -+ <br />command = = => I <br />PF1 =Help PF3= Process /Exit PF7 =Page Back PF8 =Page Forward PF12 =Cmd. Line <br />I D. Project Documentation(weight =0.13) page 8 <br />I 1. Kept Monthly and Final estimates up to date as the project <br />I progressed. <br />j 2. Tracked and monitored RFI's, shop drawings contract changes, <br />I and other action items to achieve timely resolution. <br />3. Prepared and organized thorough and complete project <br />jjj documentation including a clear filing system, Daily diaries, <br />claims documentation, Compliance monitoring and documentation, <br />weather letters, and other project records. <br />4. Input information and documentation into site Manager, EDMS, <br />and CQR /LIMS in a timely manner. <br />4 <br />4 <br />4 <br />4 <br />DOGS. Total 16 / Number of Tests 4 X0.13 = DOCUMENTS GRADE: 0.52 <br />Notes: <br />+---------------------- --------------------- - - - - -- ----------- - - - - -- ----- - - - - -+ <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 Screen 9 -+ <br />command = = => <br />I <br />PF1 =Help PF3 = Process /Exit PF7 =Page Back PF8 =Page Forward PF12 =cmd. <br />Line <br />E. Effective Administration of the Construction Contract(weight= 0.24)page 9 <br />1. Administered the contract according to plans, specifications <br />and Contract provisions. Provided clear and timely interpretation <br />j of contract documents to Contractor. <br />4 <br />2. Reviewed, approved, and monitored the Contractor's Qc <br />plan. <br />I Took action when necessary. verified that materials used <br />by the <br />Contractor substantially conformed to plans, specifications and <br />j contract provisions. <br />4 I <br />I 3. Provided daily inspection and testing services as required by <br />the contract and shared results with the contractor. Reviewed <br />contractor's Qc results, compared to vT results and took <br />appropriate actions. <br />4 <br />4. The estimate (Monthly or Final) is true and correct as <br />j determined by the Consultant's reasonable and independent <br />I <br />I investigation and measurements. <br />4 I <br />+-------------------------------------------- - - - - -- ---------------------- - - - - -+ <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ---------- Obs 8917 Screen 10 -+ <br />command = = => I <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.