Laserfiche WebLink
<br />Karl Kennedy, PE, Page 2  <br />SPECIFIC PROJECT EXPERIENCE  <br /> Preparation of the design criteria package for engineering and landscape architectural improvements  <br />for the proposed $8.0 mil Public Services Campus. The CGA Team designed the complex to have 85,000  <br />square feet under roof, including a City fueling station, and will be designed to GBC LEED “silver”  <br />standards. This includes design criteria for water, sewer, roadways, parking lots, drainage, hardscape,  <br />landscape, and irrigation. The project is being bid as a design/build project with the 30% plans and  <br />criteria package.  In addition, the overall City site includes approximately 30 acres of wetland  <br />mitigation as part of a permit issued by SFWMD, Broward County, and the Army Corps of Engineers to  <br />compensate for disturbed wetlands.  In addition the upgrading of perimeter canals are being done.  <br /> Prepared the design criteria package for a new water and wastewater treatment plant ($120.0 mil).   <br />Project consisted of facility siting, capacity requirement determination and preparation of Design  <br />Criteria package. Project acquired using the 2‐stage engineer lead Design‐Build method of delivery.   <br />The CGA Team assisted the municipality with reviewing qualification of design/builders, assistance  <br />with award.  The CGA Team was chosen to act as the as the Owner’s Engineering Representative during  <br />construction.      <br /> Designed and coordinated construction of a $15.4 mil water treatment facility expansion. This project  <br />included a 12 MGD anion exchange system for color removal, 12 MGD of treatment unit capacity and 12  <br />MGD filtration system capacity.  Final permitted facility capacity was 16 MGD with 4 MGD of redundant  <br />treatment and filtration capacity. Was Engineer of Record and carried out all project management  <br />functions including coordination of project meetings, shop drawing reviews, inspections and approval  <br />of payment requests. Project was completed as a Contractor led Design/Build project.  <br /> Designed and coordinated construction of a $14.2 mil wastewater treatment facility expansion. This  <br />Design/Build project included a permitted system capacity increase from 10.1 to 12.6 MGD (TMADF)  <br />with the addition of a 5th concrete Aeration Basin (approx 250’ x 28’) containing eight (8) cells, a 4th  <br />100 ft diameter Secondary Clarifier, a 3rd 8000 gpm Injection Well Pump with appurtenances, RAS  <br />pumping system piping modifications, Upsizing of two (2) 200 HP Aeration Blowers to 500 HP each, the  <br />addition of a 5th 500 HP Aeration Blower, and conversion of four (4) existing Aeration cells and One (1)  <br />new Basin cell to Anoxic operation. Additional improvements include replacement/modernization of  <br />the existing Plant‐Wide SCADA system.  Was Engineer of Record and carried out all project  <br />management functions  <br /> Coordinated design of modifying an existing WWTP for aquifer recharge and reuse to gain CUP credits  <br />and meet existing WWTP permit requirements.  Prepared a Pilot Study Protocol and Performance  <br />Study.  The Pilot Plant study of new treatment equipment included: Pilot plant and study design,  <br />Approval of Study by Florida Department of Environmental Protection (DEP), Pilot plant study (6  <br />months operation) including analytical testing.  In addition, he supervised Treatment Plant Design and  <br />preparation of Design Build Documents. The Basis of design report (BODR) included: preparation of  <br />construction cost estimate, process design of new equipment, sizing of new equipment and piping, and  <br />siting of equipment.  <br /> Prepared a Neighborhood Improvement Plan for the Bonaventure area of the City of Weston which  <br />encompassed an area of 7.8 square mile.  Some of the major items included landscaping/irrigation,  <br />roadway improvements and drainage improvements.  <br /> Prepared the design criteria package for an ion exchange system and was owner’s representative  <br />during construction( $1.5 mil)  <br /> Prepare the design criteria package for an on‐site sodium hypochlorite generation system and was  <br />owner’s representative during construction. ($5.0 mil)  <br /> Prepared consumptive water use permit applications, including the preparation of the reuse feasibility  <br />study, long‐term water supply plan, water conservation plan and coordination of hydrogeological  <br />modeling services.  <br />Page 3| 11