My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Karl Kennedy, PE, Page 2 <br />SPECIFIC PROJECT EXPERIENCE <br /> Preparation of the design criteria package for engineering and landscape architectural improvements <br />for the proposed $8.0 mil Public Services Campus. The CGA Team designed the complex to have 85,000 <br />square feet under roof, including a City fueling station, and will be designed to GBC LEED “silver” <br />standards. This includes design criteria for water, sewer, roadways, parking lots, drainage, hardscape, <br />landscape, and irrigation. The project is being bid as a design/build project with the 30% plans and <br />criteria package. In addition, the overall City site includes approximately 30 acres of wetland <br />mitigation as part of a permit issued by SFWMD, Broward County, and the Army Corps of Engineers to <br />compensate for disturbed wetlands. In addition the upgrading of perimeter canals are being done. <br /> Prepared the design criteria package for a new water and wastewater treatment plant ($120.0 mil). <br />Project consisted of facility siting, capacity requirement determination and preparation of Design <br />Criteria package. Project acquired using the 2‐stage engineer lead Design‐Build method of delivery. <br />The CGA Team assisted the municipality with reviewing qualification of design/builders, assistance <br />with award. The CGA Team was chosen to act as the as the Owner’s Engineering Representative during <br />construction. <br /> Designed and coordinated construction of a $15.4 mil water treatment facility expansion. This project <br />included a 12 MGD anion exchange system for color removal, 12 MGD of treatment unit capacity and 12 <br />MGD filtration system capacity. Final permitted facility capacity was 16 MGD with 4 MGD of redundant <br />treatment and filtration capacity. Was Engineer of Record and carried out all project management <br />functions including coordination of project meetings, shop drawing reviews, inspections and approval <br />of payment requests. Project was completed as a Contractor led Design/Build project. <br /> Designed and coordinated construction of a $14.2 mil wastewater treatment facility expansion. This <br />Design/Build project included a permitted system capacity increase from 10.1 to 12.6 MGD (TMADF) <br />with the addition of a 5th concrete Aeration Basin (approx 250’ x 28’) containing eight (8) cells, a 4th <br />100 ft diameter Secondary Clarifier, a 3rd 8000 gpm Injection Well Pump with appurtenances, RAS <br />pumping system piping modifications, Upsizing of two (2) 200 HP Aeration Blowers to 500 HP each, the <br />addition of a 5th 500 HP Aeration Blower, and conversion of four (4) existing Aeration cells and One (1) <br />new Basin cell to Anoxic operation. Additional improvements include replacement/modernization of <br />the existing Plant‐Wide SCADA system. Was Engineer of Record and carried out all project <br />management functions <br /> Coordinated design of modifying an existing WWTP for aquifer recharge and reuse to gain CUP credits <br />and meet existing WWTP permit requirements. Prepared a Pilot Study Protocol and Performance <br />Study. The Pilot Plant study of new treatment equipment included: Pilot plant and study design, <br />Approval of Study by Florida Department of Environmental Protection (DEP), Pilot plant study (6 <br />months operation) including analytical testing. In addition, he supervised Treatment Plant Design and <br />preparation of Design Build Documents. The Basis of design report (BODR) included: preparation of <br />construction cost estimate, process design of new equipment, sizing of new equipment and piping, and <br />siting of equipment. <br /> Prepared a Neighborhood Improvement Plan for the Bonaventure area of the City of Weston which <br />encompassed an area of 7.8 square mile. Some of the major items included landscaping/irrigation, <br />roadway improvements and drainage improvements. <br /> Prepared the design criteria package for an ion exchange system and was owner’s representative <br />during construction( $1.5 mil) <br /> Prepare the design criteria package for an on‐site sodium hypochlorite generation system and was <br />owner’s representative during construction. ($5.0 mil) <br /> Prepared consumptive water use permit applications, including the preparation of the reuse feasibility <br />study, long‐term water supply plan, water conservation plan and coordination of hydrogeological <br />modeling services. <br />Page 3| 11
The URL can be used to link to this page
Your browser does not support the video tag.