Laserfiche WebLink
<br />Karl Kennedy, PE, Page 3  <br /> Prepared rate studies for the Utilities in order to estimate the revenue requirements to ensure that  <br />each utility will operate on a financially self‐sufficient basis.  The studies included collecting, reviewing  <br />and evaluating historical and current financial records, operation and maintenance reports, forecasting  <br />customer growth, water consumption and wastewater for each customer class, reviewing capital  <br />improvement programs.  Reports were prepared for these studies.  This technical report included the  <br />data and tabular displays of the analysis listed above.  The reports were presented to the City  <br />Commissions along with conclusions and recommendations at public meetings on this rate study.  <br /> Prepared a Utilities master Plan to examine the existing utility system within the Tow of Davie’s utility  <br />service area.  Estimates of the projected water and sewer needs were made.  The physical condition of  <br />the Town’s infrastructure was examined.  Modeling of entire water and sewage transmission system  <br />was performed.  WaterCad was software used.  Recommendations for improvements to the existing  <br />infrastructure were made as well as recommendations for new infrastructure.  The following items  <br />were examined: Drinking Water, Pumping and Distribution System, Storage Tanks, Water Supply,  <br />Water Treatment Facilities, Wastewater Collection System, Wastewater Transmission Piping, Pumping  <br />System, Wastewater Treatment Facilities  <br /> Coordinated design of two High Density Polyethylene (HDPE) pipe Horizontal Directional Drills for the  <br />City of Dania Beach under two different SFWMD canals.  One crossing was under the Dania Cut Canal  <br />and the other under the C‐10 canal.  The scope of the project included 1,000 L.F. (Linear Feet) of new  <br />12” W.M. HDPE pipe, tie‐ins and hot taps to existing water mains, water service connections, and the  <br />removal of existing pipe.  The project was conducted on an expedited schedule to meet key deadline set  <br />by FDOT utility relocation schedule.  <br /> Sewage Pumping Station Design – Directed the design of new and replacement pumping stations using  <br />both dry pit pump designs and submersible pump designs from 2.5 Hp to 175 Hp pumps.  Designs  <br />included new concrete valve vaults, discharge piping, new concrete pads, fencing and landscape. The  <br />existing wet wells and receiving manhole were structurally rehabilitated. Stations included electrical  <br />control panels as well as some received separate emergency back‐up generators.  <br /> Can Pump Station Conversions – Directed the design of many replacement of existing pumps in the  <br />adjacent dry well with new submersible, non‐clog pumps in the wet well.  The wet wells are generally  <br />rehabilitated to prevent infiltration unless the wet well is not of sufficient capacity and then the wet  <br />well is converted to the terminal manhole and a new wet well is designed adjacent to the existing  <br />structure.  The stations are bypassed during construction, which also included installation of new  <br />submersible pumps, emergency electrical connections and site landscaping.  <br /> Performed computer modeling of water distribution and wastewater transmission systems using  <br />WaterCad modeling software for utilities serving from 35,000 to 165,000 customers.  <br /> Contract City Engineer for six years for a city with a population of over 65,000.  Responsible for all  <br />capital improvement projects including water, sewer, drainage, paving, landscaping and traffic projects.   <br />Projects included new stormwater pumping stations, roadway widening with additional travel lanes,  <br />bike lanes and bus shelters, installation of traffic signals, installation of round‐a‐bouts, construction of  <br />new parks and upgrades to existing parks, construction of a new city hall, construction of a public  <br />works complex with fueling station, installation of SCADA on all pumping stations. Duties include  <br />issuance of engineering permits, coordination of inspection associated with those permits, review of  <br />site plans, attendance at staff meetings and all City Commission meetings.   <br /> Prepared Engineering Standards for two municipalities.  <br /> Managed the Manatee Isles Drive Improvements project. This is two lane divided roadway, with turn  <br />lanes, in a residential area, connecting several neighborhoods to an elementary school on the east end  <br />and Florida Nature and Cultural Center on the west end. This project included added bicycle lanes,  <br />sidewalk, LED street lighting, drainage improvements, curb and gutter and improved school zone  <br />markings at the Elementary School.  Construction management services we also performed.  <br />Page 3| 12