My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fastrack MCI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Fastrack MCI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 3:56:57 PM
Creation date
6/14/2012 3:46:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Services for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Life cycle cost analysis <br />Fastrack MCI prides itself with always using the same process with <br />each client. For this process we look to see what the client /owner <br />needs are for their facility. Also similar to option analysis we look <br />at all of the maintenance items included in the project to <br />determine if there is a better or more efficient means of achieving <br />the same engineered requirements, thus providing the <br />client /owner a long -term savings. <br />This process includes all of the maintenance items from flooring <br />to mechanical components. <br />Constructability analysis <br />Fastrack MCI uses state of the art software called On Screen Take <br />Off (OSC). By using OSC we can over lay each of the sheets from <br />the design plans and maker sure every plan is fully coordinated. <br />This also allows us to quickly determine the effect and cost of any <br />changes that may be made later in the design phase, which helps <br />keep the project on track and on schedule. <br />Change Order Negotiation <br />Should an unknown condition arise which result in a change order, <br />Fastrack MCI will estimate the cost if the change order and then <br />submit it to the sub - contractor for review and to confirm it. <br />Should it ever occur that the change order were to exceed the <br />amount of the contract then Fastrack MCI will negotiate it with <br />the subcontractor prior to presenting it to the owner. <br />To date the only change orders that have been issued by Fastrack <br />MCI are deductive change orders. FMCI believes in and strives to <br />save the owner as much money as possible. <br />Security Systems <br />With Fastrack MCI's staff exceeding over 100 years of experience <br />between schools and government building we are completely <br />cognizant and well versed in the required security system. <br />City of Sunny Isles Beach I Request for Qualifications No. 12 -06 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.