My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Iron Sky
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-09-01 Automated License Plate Recognition
>
Responses
>
Iron Sky
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2012 12:09:38 PM
Creation date
10/4/2012 12:06:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Automated License Plate Recognition
Bid No. (xx-xx-xx)
12-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kapr power transformer, wireless radio, Omni-directional antenna, pole mount, 3' coax <br /> antenna cable, NEMA enclosure). Each kit is complete and clearly labeled to enable <br /> the installation contractor to bring one box to Camera #3's location on the map and <br /> install at one time. This approach ensures all the material is present and ready for <br /> install. <br /> • Ship and track all equipment according to workbook and inform subcontractor of <br /> delivery timeframe. <br /> 8) Subcontractor receives all equipment. <br /> 9) Project Manager confirms all equipment is received and schedules installation with <br /> Subcontractor and Client. <br /> 10) Project Manger supervises installation to completion addressing any issues that may arise. <br /> 11) Project Manager conducts user training. <br /> 12) Project Manger will submit system to client for testing and acceptance. <br /> 13) Upon client acceptance the system is turned over for customer operation and support. <br /> Project Approach <br /> Iron Sky is a firm believer in the importance of a methodical plan to successfully execute a <br /> project the size and complexity of this project. The foundation of the plan is a complete and <br /> thorough technical design. The design is first created by Iron Sky and then validated by the <br /> krir equipment vendors and the customer. This includes the cameras, the RF communications <br /> equipment, fiber provider and the computing and storage hardware. Once validated, the <br /> implementation plan is enacted. A key element of the implementation is the configuration and <br /> staging of the equipment before being installed. Staging further validates the design, ensures <br /> proper equipment operation and configuration and increases efficiency in the field. The staging <br /> plan closely parallels the installation plan to ensure equipment is ready for installation at the <br /> time and place most efficient to the installers. Proper coordination at this stage significantly <br /> reduces the impact to normal city operations and traffic flow. Throughout the process, the Iron <br /> Sky project manager oversees all aspects of the installation and stays in frequent <br /> communication with stake holders. As the physical installation nears completion, the critical <br /> aspect of system testing and validation begins. It is at this stage all aspects of the system are <br /> tested. The customer does not yet have control or access to the system. This stage is for Iron <br /> Sky and their vendors to completely align and tune the system before the system is relied upon <br /> for normal operation. Once validated by Iron Sky, select users are trained and given access to <br /> the system. As comfort with the system increases, additional users are trained and provided <br /> access. It is at this stage that final as-built documentation is created and delivered to the <br /> customer for on-going maintenance and support. <br /> Project Management <br /> Effective and accurate communication for a project the size and complexity of the City of Sunny <br /> Isles Beach ALPR project will be essential for success. Iron Sky proposes a project <br /> management hierarchy for decision making and communication for both the Sunny Isles Beach <br /> Police Department and Iron Sky. Both organizations shall designate an individual which has the <br /> authority, capacity and ability to speak for both organizations. Primary communication <br /> concerning the project shall occur either through, or with the full knowledge of these individuals. <br /> Iron Sky Response to the City of Sunny Isles Beach Request For Proposal#12-09-01 <br /> Section 4 Page 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.