Laserfiche WebLink
2. No wheeling, walking, or placing of heavy loads on it shall be allowed. <br /> <br />B. Protect structures in a manner approved by the ENGINEER where applicable. <br /> <br />1. If, in the final inspection of the work, any defects, faults or omissions <br />are found, the CONTRACTOR shall cause the same to be repaired or <br />removed and replaced by proper materials and workmanship without <br />extra compensation for the materials and labor required. <br /> <br />2. Assume responsibility for the satisfactory maintenance and repair of <br />the construction and other work undertaken herein, for at least the <br />guarantee period described in the contract. <br /> <br />C. Take necessary precaution to prevent damage to any structure due to water <br />pressure during and after construction and until such structure is accepted and <br />taken over by the OWNER. <br /> <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01451 - 3 Contractor’s Quality Control <br />14-1758 / 09-19-2014 <br />