Laserfiche WebLink
3. Request that the ENGINEER issue a change order in which case provide <br />accurate cost data on the proposed substitution and comparison with the <br />product or method specified, provide the OWNER with the benefit of <br />savings in cost and reimburse the OWNER for the Engineer's cost of <br />preparation and negotiation of the change order. <br /> <br />F. In the event an agreement cannot be reached, furnish the product or method <br />specified at no additional cost to the OWNER and shall reimburse the OWNER <br />for the Engineer's preparation and negotiation of the change order. <br /> <br />3.04 SHOP DRAWINGS <br /> <br />A. Acceptance of a substitution will not relieve the CONTRACTOR from the <br />requirement for submission of Shop Drawings as set forth in the Contract <br />Documents. <br /> <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01630 - 5 Product Substitution Procedures <br />14-1758 / 09-19-2014 <br />