My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Submit drawings in accordance with the Special Conditions. <br /> <br />4. Installation of additional intermediate joints shall not relieve the <br />CONTRACTOR of his responsibilities to produce a watertight and/or <br />structurally adequate component. <br /> <br />3.04 EXPANSION JOINTS <br /> <br />A. Reinforcement or other fixed items embedded or bonded into the concrete shall <br />not be run continuously through expansion joins. <br /> <br />1. A neat chamfered edging shall be provided to finish edges around <br />expansion joints. <br /> <br />B. Thoroughly clean expansion joints shall be located a minimum distance of five <br />feet from the corner of intersecting walls, including corners, unless specific <br />requests are formally made and accepted by the ENGINEER. <br /> <br /> <br /> <br />END OF SECTION <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />03100 - 6 Concrete Formwork and Accessories <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.