Laserfiche WebLink
<br />3. Remove and replace hardened mortar where adjustment must be made after <br />mortar has started to set. <br /> <br />4. Use concrete brick to course out walls concealed in the finished work. <br /> <br />5. Cut masonry units dry. <br /> <br />6. Use a masonry saws for cuts exposed to the finished work. <br /> <br />B. Clean equipment used in placing, moving, and storing mortar, at end of each day's <br />work. <br /> <br />1. Immediately before placing metal reinforcing, anchors, and ties, remove loose <br />rust, tie wires and tags and other foreign matter that will degrade the bond. <br /> <br />3.03 REINFORCING <br /> <br />A. Reinforce horizontal joints continuously with ends lapped six (6) inches and laps <br />staggered vertically. <br /> <br />B. Provide prefabricated corners and tee at intersection walls. <br /> <br />C. Reinforce above and below openings in the bed joint immediately above and below. <br /> <br />D. Extend reinforcing two (2) feet behind jambs. <br /> <br />E. Space horizontal reinforcing at sixteen (16) inches on center vertically. <br /> <br />3.04 ANCHORS AND TIES <br /> <br />A. Place anchors and ties a minimum of sixteen (16) inches vertically and twenty-four <br />(24) inches horizontally, unless otherwise indicated. <br /> <br />B. Make anchors and ties for masonry into adjacent concrete walls at the specified <br />spacing. <br /> <br />3.05 BOND <br /> <br />A. Lay masonry units in running bond by lapping unit in successive courses a distance <br />of one-half (1/2) a unit. <br /> <br />1. Level courses with joints of uniform width. <br /> <br />2. Finish joints flush. <br /> <br /> <br /> <br />Town of Golden Beach <br />Capital Improvements Project <br />04220 - 3 Concrete Masonry Units <br />08-1465/06-03-2008 <br />