My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. For couplings, supports shall be placed on each side and as close to the <br />coupling as possible. <br /> <br />1. Supports shall be of the guide type, which prevent axial movement resulting <br />in pipe deflection or misalignment. <br /> <br />K. Structural steel members can be used to support pipe. <br /> <br />L. Stainless steel piping installed in wetwells, tanks, channels, or conduits shall be <br />supported by hangers, hanger rods, anchorages, hardware, and inserts, <br />fabricated of type 316 stainless steel (L grade, if welded). <br /> <br />M. Where a specific pipe support is called for on the drawings, this support shall be <br />used as, and where indicated, for the specific application. <br /> <br />1. Spacing of supports shall be as specified herein, unless specifically modified <br />by the ENGINEER. <br /> <br />N. Support, saddles, bearing plates, and hangers, shall support by direct contact <br />the pipe a minimum of 120 degrees around, except as specified herein. <br /> <br />O. Where continuous concrete inserts are used, the maximum concentrated load <br />shall not be more than 50 percent of the maximum recommended loading of the <br />channel. <br /> <br />1. Pipe supports shall be positioned such that they will not interfere with the <br />use of hoisting equipment, where provided. <br /> <br />P. Pipes subject to thermal expansion shall be installed perfectly aligned and <br />concentricity guided. <br /> <br />1. These piping (process air, heated sludge, and hot water) support systems <br />shall be submitted to the ENGINEER for review. <br /> <br />2. The submittal shall show location of anchors, concentric pipe Guides and <br />Expansion Joints (single or double). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 24 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.