My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.20 EXISTING UTILITIES <br /> <br />A. Pipelines shall be installed using due care with regard to existing utilities. <br /> <br />1. Existing utilities are shown from best available as-built data and must be <br />located by the CONTRACTOR (“potholed”) prior to construction. <br /> <br />B. Reliance by the CONTRACTOR on existing utility locations shown on the <br />drawings is not sufficient. <br /> <br />1. Locate existing utilities prior to construction. <br /> <br />3.21 VALVE BOXES <br /> <br />A. Valve boxes, manholes, and electrical boxes, which are proposed or existing, <br />and are effected by the proposed work, shall be raised to the elevation of the <br />final grading. <br /> <br />1. This shall include additional materials as required on existing items. <br /> <br />B. Valve boxes shall be installed over each outside, buried valve, unless otherwise <br />indicated. <br />1. Valve boxes shall be centered over the valve. <br /> <br />2. Fill shall be carefully tamped around each valve box to a distance of 4 feet <br />on all sides, or to undisturbed trench face if less than 4 feet. <br /> <br />3.22 DEPTH OF COVER <br /> <br />A. Ductile iron pipe shall receive 30 inches minimum cover with approved trench <br />and backfilling techniques. <br /> <br />B. PVC/HDPE pipe shall receive 36 inches minimum cover with approved trench <br />and backfilling techniques. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 33 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.