Laserfiche WebLink
PRESSURE TEST REPORT <br />CRAIG A. SMITH & ASSOCIATES <br />CONSULTING ENGINEERS & SURVEYORS <br />1000 West McNab Road, Pompano Beach, Florida 33069 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />WITNESSED BY: <br /> <br /> (ENGINEER’S REPRESENTATIVE) (OWNER) <br /> <br /> (COUNTY) (UTILITY COMPANY) <br /> <br /> (CITY) (CONTRACTOR) <br />TEST RESULTS WERE: ( ) SATISFACTORY ( ) DOES MEET SPECIFICATIONS <br /> ( ) UNSATISFACTORY ( ) DOES NOT MEET SPECIFICATIONS <br /> <br />(Amount Allowable for Testing DIP/PVC) S X D X√P <br /> FORMULA Q = 133,200 <br /> <br />END OF SECTION <br /> PROJECT NUMBER: DATE: <br /> PROJECT NAME: <br /> LOCATION OF LINE TESTED: <br /> <br /> <br /> <br /> TIME START TEST: PRESSURE START TEST: PSI <br /> TIME END TEST: PRESSURE END TEST: PSI <br /> TEST TIME (HRS. - MIN.) AVERAGE PRESSURE: PSI <br /> QUANTITY WATER REQUIRED FOR RETURN TO START PRESSURE GAL <br /> COMPUTATION OF ALLOWABLE LEAKAGE: <br /> LENGTH OF LINE TESTED = S <br /> SIZE OF LINE IN INCHES = D <br /> AVERAGE TEST PRESSURE = P <br /> ALLOWABLE PER HOUR = Q <br /> TOTAL ALLOWANCE = GAL. X HRS. TESTED = <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 34 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />