My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Questions regarding the interpretation of a Specification should be directed to <br />the ENGINEER prior to the submittal of a proposal for, or execution of, the work <br />under this Contract. <br /> <br />1.04 DESCRIPTION OF WORK <br /> <br />A. Work to be performed under this Contract consists of furnishing materials, <br />equipment, and labor for construction of roadway and drainage <br />improvements indicated in the Drawings and described in the Specifications. <br /> <br /> B. The project shall consist of but is not limited to: <br /> <br />1. Proposed are the roadway improvements for NE 174th Street to include all <br />labor and material to perform roadway reconstruction with geotechnical <br />fabric, sidewalks, ADA ramps, detectable warning surfaces, f-curbs, valley <br />gutters, curb inlets, storm pipes, control structure, water quality treatment <br />structure, new asphalt, milling and resurfacing west of North Bay Road & <br />North Bay Road south of NE 174th Street, and striping with all other <br />associated work according to the attachments. Full landscape and <br />irrigation improvements within the full right-of-way from Collins to the <br />western terminus of 174th St are also included in this project. Construction <br />duration is for 240 days from notice to proceed to substantial completion <br />and 30 days thereafter to final completion. All other surveying services <br />are to be provided by the proposer under his/her prices. <br /> <br />If any portion of the contract documents or plans is not clear or <br />contradictive, the proposer is to submit a question/clarification in writing <br />prior to submitting a bid proposal. In any instance where the attached <br />scope of work is in conflict with FDOT specifications the more stringent <br />specification will prevail. <br /> <br />Furthermore, Bid Items Descriptions preceded by “NBR” refer to items on <br />North Bay Road south of NE 174th Street and may be removed from the <br />bid at Owner’s direction should the Pedestrian Bridge Project be awarded <br />around the same time. <br /> <br />2. Provide for the ENGINEER’s approval complete and accurate survey of as- <br />built new structures, new piping, and existing underground utilities <br />uncovered during the course of the project showing elevations and locations. <br /> <br />C. Work under this Contract shall be constructed in accordance with the lines and <br />grades shown on the Contract Drawings or as directed by the ENGINEER. <br /> <br />D. Elevations of existing ground, structures, and appurtenances, size, and location <br />of existing piping are believed to be reasonably correct but are not guaranteed <br />to be absolute and therefore are presented only as an approximation. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01110 - 2 Summary of Work <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.