My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lukes' Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(17-05-01) City Wide Landscape Maintenance Services
>
Responses
>
Lukes' Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2017 2:14:41 PM
Creation date
6/29/2017 2:59:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Wide Landscape Maintenance Services
Bid No. (xx-xx-xx)
17-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The identity of all personnel who will be performing quality control inspectlun� by name <br />and title, and verification that the person who actually performed the Wu-rk must not <br />perform quality Lu-ntrol inspections. <br />Where the QCP is returned by the Project Manager for revisions or currectio, 5, the Contractor must <br />resubmit the QCP within seven (7) days of receipt from the ProjeU Manager(s), with requested <br />revisions or correRions. The ConuaRor must not implement any changes to ILS approved 4,CP <br />prior to review and accepwnce by the ProjeR Manager(s). <br />ne ContrartOr must perform quality control InspeCdons by qualhim personnel ki.e. personnel <br />Knowleflged5le or all tecrinlcal aspects are the vvorR_ wRIcR woui0 allow It)entiricadon/aiscovery or <br />improperly perrormet) services ant) provlt)e t)ocumenwdon of the inspeUlon results to ule ProjeC[ <br />Manager(s) on a montnly Oasis. i ne Qocumenwdon must Be signet) ant) t)atet) By Me InspeUor <br />at the time the InspM0on 1s WrnpleEet). Ali compietet) InspeMon repoR3 mast ae 5u5miLiet) to ERe <br />ProjeLT Managerks). <br />z.3i wEtRCT wURR PDIA <br />Concurrent with the submission of the Annual Execution Plan (AEP), the Contractor must submit a <br />work plan for the Initial two wanks of Work. Subsequently. th% Contractor must pruvidu a Work <br />Plan ever yr Thursday to the Project Mannger(s), which will reflect the Work to be performed during <br />the next week, broken down by Site(s) and Task, and duy(s) of the week the Work will be <br />performed. <br />2.33 MONTHLY REPORir <br />The Contractor must furnish a monthly report ("Report") to the Project Manager no later than the <br />fifteenth (15th) of each month that must consist of five (5) parts, broken down as follows: <br />Part 1: Prior month', Ba51c Servlr5 activities accompli,hed, identified by park, right-of-way, <br />beach, beach access path, bus shelter or govemment facilkty and must include the dates) the <br />Work was performed. <br />rart Prior month's -Dupplemenwl cervices aMvides accomplished Identified by park right-of- <br />way, beach access path bus shelter_ parking lot_ or govemment facility_ the date(s) the vvork was <br />peRormea ant) the cosgs) associates wltR the vvorR. <br />Par�'rrior montR's Re-vvorR aMvides accomplisflet), It)endnea By parR, rigRt-or-way, Veacrl <br />access pain, flus sRelter. paMing lot. or government radlhy, the t)atets) the vvorR was peRormell <br />Part 4: Prior monEn•s Annidonal Services aMvfdes accomplisMO, It)endnet) By paf R. rigRror-way, <br />oeacrl access paER_ flus sRelrer. parRing lot. or government racillry, Erie t)ateks) me vvorR was <br />perrormen. <br />city or Senn,, 1313 sc-cm I Inait-11orl to Bin IQs. i/-t)b-t)l <br />Lulls' LuAsi:uping, lug:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.