My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lukes' Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(17-05-01) City Wide Landscape Maintenance Services
>
Responses
>
Lukes' Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2017 2:14:41 PM
Creation date
6/29/2017 2:59:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Wide Landscape Maintenance Services
Bid No. (xx-xx-xx)
17-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 5: Prior month's Inspections conducted under the QCP. This Part of the Report must Include <br />the following: <br />a. Dates of Inspection, <br />b. Name and slgnaLure of Inspector <br />c. Location of the InspeE lon <br />d. vvork inspeRed <br />e. Locations found Lo be non-compilanL <br />I. Deiiclencies iount7 per location <br />II. mEdons wren Lo correR aaenclencies <br />iii. Antons taRen Lo mitigate ruwre occurrences or tRe t1encienctes <br />ConuaMr must provltle PrvjeLT Managerts) wlrR a RaM copy ano/or eleETronic copies or all rorms <br />ano 17ocuments prepa= as paR or the qualky Control Plan monitoring. <br />c.sq EmERGENCT RESPONSE PD{N <br />The Contractor must prepare and famish to the Project Manaycr(s) for ..view and acceptance an <br />Emarg.n7y, R-,spon3c Plan ERP'-) within thiRy7 t30) days after execution of the Contract. The ERP <br />must outline the Contractor's response procedures In the event of an GmErgzn7y, damage, ur <br />adverse weather conditions Including hurricanc3, rain, high winds, or flooding. The ERP must <br />address the Contractor's coordinetiun procedures with the City. <br />The ERP must include a provision for cooperating with thc- City to fumi5h Contractor's forces to <br />supplement the City's staff In hurdmne preparedness, evacuation plans, and hurricane disaster <br />response of the disaster event within the project limits. In the event that ServIc=— or equipment <br />will be deemed as Supplemental Services and paid for In accordance with Section 7 of the Contract. <br />2.35 PRIORITY <br />The wnudLuur, on an Immediate and fast priorlty basis, shall make available all Its resources and <br />equlpment to the City In the event of an AR of 'God (I.e. storm_ Lomado_ or hurricanes or an auto <br />accident that causes a tree to fall and block a roat7way or petlesuian area_ or any ower emergency <br />deemed by the Clty Manager or RIs aeslgnee. vvorR may Inclut]e Rut Is not IlmlM to roaaway <br />clearing, Mtensive dean -up ana:r tlisposal aMvides. Au t3eRris removes rrom we Llty will Ge legally <br />Oisposm or at an EPA ant1lor Chy approves Gump site. EacR May 191_ me ConuraRor snall suRmit <br />ror City approval, an Emergency Kesponse Plan speciTically reladng to manpower, equipment antl <br />stns=_auling in accortiana_e wlrR ARicle <br />c.s6 uNSA i aSFACTORT wORR 10 6E CORREc i tO 6T i Rt t.uN i KA4I UK <br />r ne Contractor shall promptly correct all apparent and latent deficiencies and/or defects in work, <br />and/or an, Unsatisfacto� yy Work that fails to Lvnfurm to the contract documents rcyardless of <br />protect completion status. If Ummd3factorp Work Is Identified, through planned, random or <br />City of Sunny Isles Beach I Invitation to Bid No. 17-05-01 <br />LuKus' LandscaV;,,g, Inc. `: <br />
The URL can be used to link to this page
Your browser does not support the video tag.