APPROACH/METHODOLOGY I Q <br /> ® pipe shall be a solid schedule 40 PVC pipe. The PVC =0 �� ; m <br /> pipe shall then connect to a local water management , <br /> system (NIC). , <br /> • Installation of a tiled (herringbone pattern) drain field, ' • <br /> consisting of multiple rows of perforated flat panel drain <br /> pipe that is connected directly to the perforated pipe in jj = a - <br /> the perimeter trenches. —. -�_= `-- .- <br /> • Installation of aggregate materials in a manner and type, �y <br /> as necessary to meet specified performance requirement ' � ` - �- <br /> of the stone base, and to achieve the specified finish �� vr <br /> grade. ... . ..... _.— . . _ - • . : - , <br /> • Installation of the synthetic grass tufted to a 2"pile height, <br /> having 240-micron (min), 100% polyethylene fibers with <br /> a dimensionally stable primary backing that meets the — :;, ;ii ` <br /> performance requirement as delineated herein. _}, - A f <br /> L r. + .>:x.� s .K <br /> • Installation of all in-laid lines (painted if required by ; :<•._-:" _ - - __ <br /> owner), markings and numbers. <br /> • Installation of a resilient crumb rubber/silica sand infill _ , ' <br /> system, per the specifications of the synthetic grass - • : ...,44.-1.'t_ ; <br /> contractor. <br /> • All necessary inspections and testing that each component in the entire system has been properly <br /> ® <br /> prepared and/or installed, including: excavation, perimeter curbing & nailers, collector drains, stone <br /> sub-base, finished stone base, sloping, synthetic turf and G-max testing. <br /> • BASE CONSTRUCTION: <br /> SUB BASE — After removal of all organic material and debris from the playing field area, the area is to <br /> be cut down no less than 6 inches from the top of the proposed finished height of the base. The sub base <br /> shall be roll tested to find "soft spots", compacted and rolled to as close as possible to a 95% proctor <br /> density and be sloped 0.5% - 1% from the centerline "ridge" of the playing field towards both sidelines. <br /> NOTE: The ridge on baseball and softball fields shall run from home plate, through second base and out <br /> to centerfield. <br /> CONCRETE CURBING / NAILER — A trench shall be excavated around the perimeter of the playing field <br /> to accommodate a wide x 1 2" deep concrete curb. The concrete shall be 3500 psi minimum, to a uniform <br /> specified grade. After a minimum 2-day cure time, a pressure treated (PT) nailer board shall be secured <br /> to the concrete curb using mechanical fasteners (Ramset, or equivalent). The fasteners shall be spaced on <br /> 24" centers. The fasteners nearest to the ends of the nailers shall be no more than 6" from the end. <br /> PERIMETER TRENCH (Collector Drain) —The perimeter trench shall be installed around the field, adjacent to <br /> the inside edge of the concrete curb. The trench shall be approximately 2' wide at the top, tapering down <br /> to an adequate size that will accommodate a 010" (min) pipe. The depth of the trench shall be sufficient <br /> to allow the pipe to be properly sloped (0.25% minimum) to ensure a positive outflow of water. <br /> ® <br /> Recreational Design & Construction, Inc. I RFP NO. 12-10-03 132 <br />