APPROACH/METHODOLOGY I Q <br /> i II <br /> ■ <br /> GEOTEXTILE (Trench) —The first item installed in the perimeter trench shall be a non-woven geotextile fabric <br /> Mirafi® 140N (as manufactured by TenCate), or equivalent. The geotextile fabric shall cover the nailer <br /> board, the concrete curb, the bottom and both sides of the trench and extend onto the adjacent sub-grade <br /> of the field by a minimum of 12". <br /> GEOTEXTILE (Main Field) — The first item installed on the field shall be a non-woven geotextile filter fabric. <br /> Adjacent sections of geotextile shall be overlapped 15"-18" and shingled in the direction of the slope of <br /> the field. The geotextile shall cover the entire field. <br /> TRENCH PIPE — There shall be a 010" (minimum) High Density Polyethylene (HDPE) perforated pipe at the <br /> bottom of the trench for conducting water runoff from the field to a local water management system. The <br /> entire length of the trench pipe shall be wrapped in a fabric "sock". <br /> TILED DRAINFIELD — 1" x 12" Composite flat drain pipe shall be laid out on the geotextile fabric on the <br /> body of the field in a herringbone patter. The rows of flat panel pipe shall be set at a 45° angles extend- <br /> ing from the ridge of the field to the trenches and connected directly to the perforated pipe in the trenches. <br /> The rows of flat drain pipe shall be spaced on 15' centers. The ends of the flat drain at the ridge of the <br /> field shall be capped. <br /> OUTLET DRAIN CONNECTION —There shall be an outlet pipe that connects the trench pipe to a local water <br /> management system, or an existing outflow pipe. The length and depth of the outlet drain connection pipe <br /> ® shall be as required per installation. The outlet pipe shall be a 010" (Minimum) solid schedule 40 PVC <br /> pipe. <br /> STONE BASE (Bottom Layer) — The first stone to be installed in the trenches shall be 3/4" (#56 or#57) <br /> Crushed / Clean / Washed Road Stone. The trench stone should be installed in 3" lifts and compacted to <br /> a 95% proctor. When the trenches are filled up to the level of the sub-base of the main field, four more <br /> inches (min) of the same stone shall be added over the trenches and the entire surface of the playing field. <br /> All of this shall be compacted to a 95% proctor. This layer shall be top-graded at a 0.5%-1.0% from the <br /> center ridge of the field. After the first layer of stone meets these criteria,the second layer can be installed. <br /> STONE BASE (Top Layer) — The top 2" (max) of stone over the trench shall be 1/4-3/8 CLEAN, WASHED, <br /> CRUSHED STONE and compacted to 95% proctor. <br /> It is most important that the top surface of the second layer is as flat as possible. This layer is where the <br /> base work shall be fine-tuned to ensure a uniform planar surface for the playing field. The tolerance for the <br /> finished top surface of this layer of base shall be a 1/4 inch in ten feet. An electronic or staked grade grid, <br /> of not more than 25' separation will be used, to establish finished grade of the aggregate base, before <br /> installing the synthetic grass. The aggregate base should not deviate from specified finish grade by more <br /> than V/4" in ten feet. <br /> 0 <br /> Recreational Design & Construction, Inc. I RFP NO. 12-10-03 033 <br />