My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2716
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 11:38:29 AM
Creation date
1/17/2018 12:25:52 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2716
Date (mm/dd/yyyy)
07/20/2017
Description
Agmt w/American Ramp Co. for Design/Build of Skate Park at Haulover
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 15% Plans. When 15% of the overall design of the Skatepark has been completed (i.e., <br />Concept Plans and including site layouts), Contractor shall submit two copies of such Preliminary <br />Plans to the City for review, to insure conformity with Proposed Concept Plans shown in <br />Attachment "C" and the Haulover Park approved general plans. The Preliminary Plans must be <br />prepared by an architect or engineer licensed to practice in the State of Florida. If the City has <br />any comments and/or proposed modifications to the Preliminary Plans, the City shall provide <br />comments and/or proposed modifications in writing to the Contractor within fifteen (15) calendar <br />days from the date of submittal of the Preliminary Plans. Contractor shall incorporate said <br />comments into a set of revised Preliminary Plans to be reviewed and approved by the City. <br />7.3 50% Plans and Specifications. The 50% Plans and Specifications shall be based on the <br />approved Preliminary Plans and shall show without limitation any/all work to be performed in <br />the field, including site plans; architectural, structural, grading, and drainage plans, signage and <br />all other disciplines engaged in the development of the construction documents of the Skatepark. <br />Contractor shall provide the City sufficient information to enable it to make an informed <br />judgment about the design and quality of construction. Within fifteen (15) calendar days after <br />the City receives the 50% Plans and Specifications, the City shall either approve them or deliver <br />to Contractor specific corrective comments. Contractor shall resolve all comments and requests <br />for modifications by City to the 50% Plans and Specifications and obtain written approval from <br />City prior to proceeding with the development of the Final Plans. . <br />7.4 Final Plans. Contractor shall. prepare and deliver to City a complete set of the final plans <br />and specifications which shall show without limitation any/all work to be performed in the field, <br />including site plans; architectural, structural, grading and drainage plans, signage and all other <br />disciplines engaged in the development of the construction documents and completed technical <br />specifications; all sufficient to enable City to make an informed judgment about the design and <br />quality of construction and with sufficient detail so as to allow for the issuance of a building <br />Permit (hereinafter referred to as "Final Plans"). The Final Plans shall be based upon, and <br />consistent with, the approved 50% Plans and Specifications. City shall, within fifteen days (15) <br />calendar days upon receipt of the Final Plans, either approve. them or deliver to Contractor <br />specific corrective comments. Contractor shall resolve all comments and requests for <br />modifications by City to the Final Plans and obtain written approval from City prior to submitting <br />the Final Plans to the regulatory agencies for permitting. <br />7.5 Mobilization. It shall be the Contractor's responsibility to ensure that all required <br />regulatory or proprietary permits are obtained prior to commencement of Work. Once regulatory <br />agencies have granted all necessary approvals and a permit(s) has/have been issued, Contractor <br />shall provide City with copies of each issued permit. A Pre -Construction Meeting will then be <br />scheduled for the Contractor to coordinate with Miami -Dade County personnel managing the <br />park in respect to access, staging area, hours of operation, etc. After the Pre -Construction <br />Meeting, an authorization to occupy the site will be issued by Miami -Dade County to the City <br />thus allowing the Contractor's mobilization for the construction phase. After the City approves <br />the construction baseline schedule submitted by Contractor, a copy shall be provided to Miami - <br />Dade County for informational purposes. <br />03"178 - AMERICAN RAMP COMPANY <br />