My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2800
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 4:42:51 PM
Creation date
3/20/2018 4:10:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2800
Date (mm/dd/yyyy)
03/15/2018
Description
Approve Agmt w/Perkins+Will for Interior Remodel of Gov’t Ctr Lobby & GW Park Build-Out
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS+WILL <br /> program and or layout revisions will be billed as additional services. Note: at this point the design has been developed <br /> as a parametric BIM 3D model, so changes to previously approved layout will impact the project schedule. <br /> We will provide Final Design Development ("DD") services based on the approved schematic design package: <br /> A. Project coordination throughout all phases. <br /> B. Conferences with staff <br /> C. Formulation of systems: Structural, Mechanical, Electrical, Telecommunications (telephone and data /AV) <br /> D. Selection of major interior materials, finishes and preliminary furniture and equipment. <br /> F. Preparation of documents: Floor plans, Elevations, and coordination of systems (structural, mechanical,,and <br /> electrical) (5) Interior elevations/millwork profiles, Reflected ceiling plan and lighting, Furniture selections and <br /> preliminary budget, Outline specifications including preliminary color and materials schedule. <br /> G. Coordination with structural, mechanical, plumbing, electrical and kitchen equipment consultants <br /> H. The Design Development Package will be used by cost estimator to provide preliminary construction costs <br /> I. Coordination of budget costs for owner supplied (FF&E) items <br /> J. Detailed budget to be provided with the initial presentation for interior finishes and furniture which should be <br /> monitored and updated with changes that follow <br /> K. Coordination of kitchen/food and beverage equipment recommendations <br /> L. Presentation materials <br /> M. Progress reviews shall be required at the 50% and 100% design stage for review and approval by City staff. <br /> D. CONSTRUCTION DOCUMENTS, PHASE 4 <br /> The construction document phase includes the final development of the specifications and the detailed drawings <br /> required to permit, bid and build the project. The work of this phase leads to the specific coordination of <br /> specifications and detailed drawings that clearly communicate the materials, parts, and assemblies that achieve the <br /> design intent and budget.of the project. Preparation of a complete set of construction documents developed from <br /> the client approved Design Development set. The Construction Documents will be sufficient for complete and <br /> accurate pricing, permit submission and construction of the intended building. Documents shall be complete, <br /> thorough and well-coordinated between consultants and disciplines. The project will proceed into the bidding, <br /> negotiation and construction with the owner's agreement that the documentation is complete. <br /> We will provide Construction Documents and Specifications(CD)services based on the approved Design Development <br /> package: <br /> A. Project coordination with awarded Consultant. <br /> B. Conferences with staff <br /> C. Documentation of systems and coordination with consultants: Structural, Mechanical, Electrical, Fire Protection, <br /> Telecommunications, Kitchen Equipment <br /> D. Full and complete specification of interior finish materials, color selections and furniture. <br /> F. Preparation of construction documents, including but not limited to: Floor plans, Plans and descriptions of <br /> systems; structural, mechanical, and electrical, Interior elevations/millwork profiles/details, Reflected ceiling <br /> plans and lighting. <br /> G. Final estimate of probable construction and FFE costs, if necessary <br /> H. Drawings and written specifications for kitchen/food and beverage equipment <br /> I. Written architectural specifications/project manual <br /> We will provide the City the construction documents on or before eighty (80%) of completion for review with the <br /> Building Department for a preliminary review. In addition, by the eighty.(80%) percent completion of the <br /> Construction Documents we will provide in coordination with our cost estimating consultant an updated <br /> Page 13 <br /> SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.