PERKINS+WILL <br /> P +W understands that the City will solicit bids from prequalified contractors and identify long lead time items. <br /> Our team will respond to questions raised concerning the documents (RFI's.) We will answer questions from <br /> bidding contractors and develop any addenda drawings to address the questions as required.. We will attend <br /> General Contractor bid review meetings as requested. This phase includes two (2) meetings. Additional meetings, <br /> -Permitting duration, or scope beyond that specified herein will be billed hourly: <br /> We recommend the client hires a plans expediter to assist in the processing of permits. <br /> Construction Administration: <br /> The primary goal of this phase of the project is to provide information, direction and assistance to the owner and <br /> constructor that reinforces and clarifies the design intent set forth in the contract documents, both in the field <br /> and in the review of submittals. Additionally, the architect's role as the owner's advocate is exercised through <br /> field observations, submittal review, changes to the work and review of constructor Payment Applications. We <br /> will review and approve required shop drawings, samples, product information, as required to facilitate <br /> completion of the project. Review period to be within 2 weeks for any single submission. <br /> We will visit and walk the premises or the fabricator's shop, if located in South Florida, and as required during <br /> construction as to monitor progress of the work and verify that work is proceeding in accordance with the <br /> contract documents. These Construction Administration visits will be a maximum of 1 visit every 2 weeks for the <br /> duration of construction/fabrication, and one (1) Punch List review. <br /> Our team will prepare periodic field reports as necessary, and review and process the contractor's application for <br /> payment. Additional meetings listed above, extended CA duration, or CA scope beyond that specified herein will be <br /> billed hourly. <br /> P+W understands that the majority of the fabrication /construction will be done off-site. Installation work to be done <br /> during off-hours, over the course of one or two or three weekends if possible. For example: Reception Desk area, art <br /> vitrines, city model and Visitor Center as different weekend installations if this reduces disruption to the Lobby and <br /> Visitor Center and Library. Temporary security desk may be needed. Power, data, telecom and CCTV to be carefully <br /> coordinated. <br /> At the end of this phase, the architect assists in the Project Close-out as a means of transferring ownership of <br /> the project from the constructor to the owner. <br /> This Construction Administration fee assumes a total 8 weeks for fabrication and construction. <br /> F F and E <br /> If required at a later date, our team will select furniture and prepare information for and coordinate with the <br /> selected furniture dealer. This scope will be billed hourly not to exceed an agreed upon amount. <br /> Additional Services and Consultants: <br /> This scope and fee proposal does not include consultants beyond those described in the attached documents <br /> related to basic services for programming and interior architecture and design and structural / MEP efforts. Perkins <br /> +Will can provide consultant services as an additional service if requested by the client; these services may <br /> include but are not limited to the items listed on the Standard Exclusions/Additional Services Form attached. <br /> Services required and requested by the Client which are outside the scope of this proposal will be billed hourly or <br /> Page 14 <br />