My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Cummins Cederberg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 9:57:53 AM
Creation date
3/23/2018 9:52:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (continued) <br />(Complete one Section E for each key person.) <br />12. NAME <br />Gina Francesca Chiello <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> <br /> b. WITH CURRENT FIRM <br />2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. South Miami and Jupiter, Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />Member of America Academy of Underwater Sciences <br />Member of Florida Association of Environmental Professionals, Treasure Coast Chapter - Treasurer <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br />f. <br /> <br /> <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />g. <br /> <br /> <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />h. <br /> <br /> <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />i. <br /> <br /> <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />j. <br /> <br /> <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Marine Biology <br />Graduate Certificate in GIS, Environmental Science <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br /> <br /> <br />8 <br /> (1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CONSTRUCTION (If applicable) <br />CONSTRUCTION (If applicable) <br />CONSTRUCTION (If applicable) <br />Bakers Haulover Inlet, Village of Bal Harbour <br />2014 2014 <br />Conducted a marine resource assessment of the existing jetty and proposed footprint of the reconfigured jetty <br />as required by the environmental regulatory agencies to evaluate impacts related to the proposed Project and as <br />required to secure permits for the proposed Project. A Field Observation Report was prepared documenting the <br />extent, species, and density of existing marine resources. <br />Village of Key Biscayne Beach Re-nourishment, <br />Village of Key Biscayne 2013 2015 <br />Conducted resource assessments of the nearshore seagrass habitat using the Braun Blanquet method to monitor <br />twenty-seven 35 meter long transects and conducted nearshore seagrass edge mapping, to evaluate any <br />unanticipated project related impacts. Monitoring Reports were prepared, per the project specific permit <br />requirements, documenting the findings of the nearshore seagrass edge surveys and Braun Blanquet monitoring <br />data. <br />Hollywood Beach Re-nourishment, Hollywood <br />2014 2015 <br />Conducted pre-construction transect installation and biological monitoring including hardbottom mapping. <br />Acropora cervicornis health tracking, and assessment of the nearshore reef using BEAMR, and conducted post <br />construction hardbottom and epifaunal edge surveys. Monitoring reports were prepared per the project <br />specific permit conditions. <br />Miami Harbor Phase III, Miami <br />2014 2014 <br />Conducted post-transplantation surveys of 38 Acropora cervicornis colonies. Work involved <br />locating and tagging colonies, taking photographs, measuring colony size, identifying stress <br />indicators, and assessing tissue color and partial mortality. Fragments were reattached via apoxy. <br />Monitoring reports were prepared per the project specific permit conditions. <br />6800 Indian Creek Docking Facility, Miami Beach 2014 2016 <br />Managed project and coordinated with the USACE, DEP, and DERM to secure permits and sovereign <br />submerged lands authorization via a lease modification, to reconfigure a multifamily 16-slip <br />docking facility with ADA access, in conjunction with an upland multifamily redevelopment in the <br />Biscayne Bay Aquatic Preserve.
The URL can be used to link to this page
Your browser does not support the video tag.