Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. South Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B. Sc. Environmental and Marine Science <br />M.P.S. Environmental and Marine Science <br /> <br />12. NAME <br /> <br />Elizabeth Jones <br />13. ROLE IN THIS CONTRACT <br /> <br />Marine Biologist <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />4 <br /> b. WITH CURRENT FIRM <br />3 <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />MOCC Boating Certification <br />AAUS Scientific Diver Authorization <br />PADI Advanced Diver and Rescue Diver Certified <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br /> <br /> <br /> <br />a. <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br /> <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br /> <br /> <br /> <br />b. <br /> <br /> Sunny <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br /> <br /> <br /> <br /> <br /> <br /> <br />c. <br /> (1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />d. <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br /> <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br /> <br /> <br /> <br />e. <br /> <br /> <br /> <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Coastal Towers Marina and Shoreline Stabilization <br />Project, Sunny Isles <br />fPerformed marine resource surveys along 2,300 linear feet of seawall to assess potential impacts o <br />hdevelopment and identify corals and seagrass located within the project footprint. Coordinated wit <br />DERM, DEP, NMFS and USACE to obtain environmental permits for construction activities. <br />Winston Tower 700 <br />Pelican Island Docking Facility, Miami <br />Performed marine resource surveys to identify species of concern at the <br />project site, developed coral relocation plan and coordinated with DERM,DEP <br />and USACE to obtain environmental permits. <br />Crandon Park Northern Shoreline Stabilization, Key Biscayne <br />Conducted marine resource and mangrove surveys to identify and delineate areas of natural <br />resources. Developed a mangrove restoration plan to provide enhanced shoreline protection <br />and increase local biodiversity. Coordinated with DERM, DEP and USACE to obtain permits. <br />(1) TITLE AND LOCATION (City and State) <br />JCC Kayak Dock, Miami Beach <br />, <br />2018 on-going <br />2016 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction of 240 feet of seawall and repair of 800 feet of seawall for shoreline stabilization <br />at large condominium. Above/below water condition inspection, seawall replacement and repair design <br />permit application and processing (DERM/USACE/DEP), construction administration. <br />2017 2018 <br />Check if project performed with current firm <br />2017 on-going <br />2015 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coordinated with County, State and Federal (DERM, FDEP, USACE, respectively) <br />permitting agencies to design a mitigation plan for Johnson's seagrass, which was <br />identified at the project site.