|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Carlos A. Mercado, P.E. Professional Engineer / Project Supervisor
<br />a. TOTAL b. WITH CURRENT FIRM
<br />26 5
<br />15. FIRM NAME AND LOCATION (City and State)
<br />GFA International, Inc. Delray Beach,
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S. Civil Engineering
<br />M.S. Geotechnical Engineering
<br />
<br />Florida - Professional Eng. #71707
<br />Puerto Rico - Professional Eng.
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers
<br />Puerto Rico Professional College of Engineers and Land Surveyors
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hillsboro Beach Renourishment Truck Haul Project, Town of Hillsboro Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br /> 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Geotechnical Engineer / Supervisor - The project consisted of the truck haul placement of approximately +/-47,278 cubic yards of beach fill between FDEP monuments R-
<br />6+750 to R-9 in Hillsboro Beach, Florida. The overall project is for approximately 2,198 linear feet. GFA was responsible for providing geotechnical engineering
<br />consisting of vibration monitoring, pre-construction structural survey, quality control plan management, quality control testing, and environmental engineering. Mr.
<br />Mercado worked with the project team on coordination of our services and overseeing the project budget and quality of work provided.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />USACE Beach Erosion Control & Hurricane Protection – Sunny Isles Beach, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br />) 2017 - 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Geotechnical Engineer / Supervisor - The project consisted of the renourishment of approximately 2.4-miles of shoreline of the Sunny Isles Beach located in Dade
<br />County. Two critically eroded areas of shoreline were renourished with approximately 140,000 cubic yards of beach-quality sand. GFA was responsible for providing
<br />geotechnical engineering consisting of vibration monitoring, pre-construction survey, quality control plan management and quality control testing. Mr. Mercado worked
<br />with the project team on coordination of our services and overseeing the project budget and quality of work provided.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Shore Protection Project – Segment II Beach Fill, Broward Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br />) 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Geotechnical Engineer / Supervisor - The project consisted of the nourishment of two sections of the Broward Beach. “Group 1” of this project pertained to the northern
<br />section, which received 245,370 tons of sand onto 1.38 miles of beach in Pompano and Lauderdale by the Sea. “Group 2” of this project pertained to the southern
<br />section, which received 779,775 tons of sand onto 3.56 miles of beach in Lauderdale by the Sea and Fort Lauderdale. GFA was responsible for providing geotechnical
<br />engineering consisting of vibration monitoring, pre-construction structural survey, quality control plan management, and quality control testing. Mr. Mercado worked
<br />with the project team on coordination of our services and overseeing the project budget and quality of work provided.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Flood Control and Coastal Emergency Beach Erosion Control Segment II, Broward County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br /> 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Geotechnical Engineer / Supervisor - The project consisted of the renourishment of 5.1 miles of critically eroded shoreline immediately south of Hillsboro Inlet, between
<br />Florida Department of Environmental Protection Range Monuments R-26 to R-53.X. The project duration was 152 days. GFA was responsible for providing geotechnical
<br />engineering consisting of vibration monitoring, pre-construction structural survey, quality control plan management, and quality control testing. Mr. Mercado worked
<br />with the project team on coordination of our services and overseeing the project budget and quality of work provided.
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Dune Restoration Project, Palm Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br /> 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Geotechnical Engineer / Supervisor - The project consisted of the restoration of dunes near 3550 S. Ocean Boulevard in Palm Beach, Florida. Approximately 7,000 tons of
<br />material was hauled in and placed for this project. GFA provided pre and post-construction structural survey services, developed a vibration control plan, monitored
<br />ground vibrations with remote seismograph systems, and performed quality control testing and management which consisted of laboratory testing services. Mr.
<br />Mercado worked with the project team on coordination of our services and overseeing the project budget and quality of work provided.
<br />
<br />
<br /> STANDARD FORM 330 (6/2004) PAGE 1 of 2
<br />124
|