Laserfiche WebLink
RELEVANT PROJECTS CONTINUED <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Beach Erosion Control and Hurricane Protection Project, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br /> 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Geotechnical Engineer / Supervisor – This project consisted of the renourishment of critically eroded shoreline at the Miami Beach Hotspots located at approximately <br />55th Street and 46th Street in Miami Beach between Florida Department of Environmental Protection Range Monuments R-49.5 to R-50.5 and R-53.7 to R-55.5 <br />respectively. The project duration was 248 days. GFA provided pre and post-construction structural survey services, developed a vibration control plan, monitored <br />ground vibrations with remote seismograph systems, provided a vibration control specialist and vibration technicians, performed quality control testing and <br />management which consisted of laboratory testing services, and provided turbidity sampling in accordance with project specifications. Mr. Mercado worked with the <br />project team on coordination of our services and overseeing the project budget and quality of work provided. <br /> <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Hillsboro/Deerfield Beach Nourishment, Broward County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br /> 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Geotechnical Engineer / Supervisor - The project consisted of the nourishment of a shoreline located in Broward County, Florida. Approximately 70,000 cubic yards of <br />beach sand was hauled in and placed. GFA performed construction materials testing, which consisted of conducting all laboratory testing at our USACE accredited <br />laboratory as required by project specifications, providing equipment and qualified engineering technicians to sample aggregate and soils, and providing a project <br />manager/quality control manager to supervise and coordinate all laboratory and field testing performed by GFA personnel. GFA provided turbidity sampling in <br />accordance with project specifications. GFA provided vibration monitoring services including a remote seismograph. Mr. Mercado worked with the project team on <br />coordination of our services and overseeing the project budget and quality of work provided. <br /> <br /> <br />h. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Jupiter/Carlin Park Shore Protection Project 3, Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br /> 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Geotechnical Engineer / Supervisor - The project consisted of the renourishment of a section of Carlin Park Beach in Palm Beach County, Florida. GFA performed <br />construction materials testing, which consisted of conducting all laboratory testing at our USACE accredited laboratory as required by project specifications, providing <br />equipment and qualified engineering technicians to sample aggregate and soils, and providing a project manager/quality control manager to supervise and coordinate <br />all laboratory and field testing performed by GFA personnel. Mr. Mercado worked with the project team on coordination of our services and overseeing the project <br />budget and quality of work provided. <br /> <br /> <br /> <br />i. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Village of Key Biscayne Beach Restoration Maintenance Project <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br /> 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Geotechnical Engineer / Supervisor - The project consisted of the renourishment of eroded shoreline at the Key Biscayne Hotspots in Key Biscayne, Florida. GFA worked <br />on pre and post-construction structural survey, vibration quality control plan, vibration monitoring, quality control plan, soil testing, and turbidity monitoring. Mr. <br />Mercado worked with the project team on coordination of our services and overseeing the project budget and quality of work provided. <br /> <br /> <br /> STANDARD FORM 330 (6/2004) PAGE 2 of 2 <br />125