E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Estela Leon Aguilar, P.E. Project Engineer
<br />a. TOTAL b. WITH CURRENT FIRM
<br />5 3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />GFA International, Inc. Delray Beach, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />University of FL - Master of Science in
<br />Civil/Geotechnical Engineering ('13); University of FL - B.S.,
<br />Civil Engineering, Cum Laude ('12); Broward College -
<br />Associates of Arts in Civil Engineering, Honors ('10)
<br />• State of Florida Professional Engineer #83307
<br />• ACI Concrete Field Testing Technician - Grade I, #01277024
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Beach Erosion Control and Hurricane Protection Project, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br /> 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer – This project consisted of the renourishment of critically eroded shoreline at the Miami Beach Hotspots located at approximately 55th Street and 46th
<br />Street in Miami Beach between Florida Department of Environmental Protection Range Monuments R-49.5 to R-50.5 and R-53.7 to R-55.5 respectively. The project
<br />duration was 248 days. GFA provided pre and post-construction structural survey services, GFA developed a vibration control plan, monitored ground vibrations with
<br />remote seismograph systems, provided a vibration control specialist and vibration technicians, performed quality control testing and management which consisted of
<br />laboratory testing services, and provided turbidity sampling in accordance with project specifications. Ms. Aguilar was responsible for project coordination with the
<br />client, as well as reviewing biweekly vibration monitoring reports and submittal to the QC manager, as well as reviewing turbidity sampling results.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Dune Restoration Project, Palm Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br /> 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer – This project consisted of the restoration of dunes near 3550 S. Ocean Boulevard in Palm Beach, Florida. Approximately 7,000 tons of material was
<br />hauled in and placed for this project. GFA provided pre and post-construction structural survey services, GFA developed a vibration control plan, monitored ground
<br />vibrations with remote seismograph systems, provided a vibration control specialist and vibration technicians, and performed quality control testing and management
<br />which consisted of laboratory testing services. Ms. Aguilar was responsible for project coordination with the client, as well as reviewing biweekly vibration monitoring
<br />reports and submittal to the QC Manager.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hillsboro Beach Renourishment Truck Haul Project, Town of Hillsboro Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br />) 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer – This project consisted of the truck haul placement of approximately +/-47,278 cubic yards of beach fill between FDEP monuments R-6+750 to R-9 in
<br />Hillsboro Beach, Florida. The overall project is for approximately 2,198 linear feet. GFA was responsible for providing geotechnical engineering consisting of vibration
<br />monitoring, pre-construction structural survey, quality control plan management, quality control testing, and environmental engineering. Ms. Aguilar was responsible
<br />for project coordination with the client, as well as reviewing biweekly vibration monitoring reports and submittal to the QC Manager.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hillsboro/Deerfield Beach Nourishment, Broward County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br />) 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer - The project consisted of the nourishment of a shoreline located in Broward County, Florida. Approximately 70,000 cubic yards of beach sand was
<br />hauled in and placed. GFA performed construction materials testing, which consisted of conducting all laboratory testing at our USACE accredited laboratory as
<br />required by project specifications, providing equipment and qualified engineering technicians to sample aggregate and soils, and providing a project manager/quality
<br />control manager to supervise and coordinate all laboratory and field testing performed by GFA personnel. GFA provided turbidity sampling in accordance with project
<br />specifications. GFA provided vibration monitoring services including a remote seismograph and biweekly reports submitted to the QC Manager. Ms. Aguilar was
<br />responsible for project coordination with the client, as well as reviewing biweekly vibration monitoring reports and submittal to the QC Manager.
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Shore Protection Project – Segment II Beach Fill, Broward Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if
<br /> 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer - The project consisted of the nourishment of two sections of the Broward Beach. “Group 1” of this project pertained to the northern section, which
<br />received 245,370 tons of sand onto 1.38 miles of beach in Pompano and Lauderdale by the Sea. “Group 2” of this project pertained to the southern section, which
<br />received 779,775 tons of sand onto 3.56 miles of beach in Lauderdale by the Sea and Fort Lauderdale. GFA provided pre-construction structural survey services,
<br />developed a vibration control plan, monitored ground vibrations with a remote seismograph system, provided a vibration control specialist and vibration technicians,
<br />and submitted biweekly reports to the QC Manager, and performed quality control testing and management which consisted of laboratory testing services. Ms. Aguilar
<br />was responsible for project coordination with the client, as well as reviewing biweekly vibration monitoring reports and submittal to the QC Manager.
<br />
<br /> STANDARD FORM 330 (6/2004) PAGE 1 of 2
<br />126
|