Laserfiche WebLink
RELEVANT PROJECTS CONTINUED <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Beach Erosion Control and Hurricane Protection Project, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br /> 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Staff Engineer – This project consisted of the renourishment of critically eroded shoreline at the Miami Beach Hotspots located at approximately 55th Street and 46th <br />Street in Miami Beach between Florida Department of Environmental Protection Range Monuments R-49.5 to R-50.5 and R-53.7 to R-55.5 respectively. The project <br />duration was 248 days. GFA provided pre and post-construction structural survey services, developed a vibration control plan, monitored ground vibrations with remote <br />seismograph systems, provided a vibration control specialist and vibration technicians, performed quality control testing and management which consisted of <br />laboratory testing services, and provided turbidity sampling in accordance with project specifications. Mr. Berry was responsible for performing vibration monitoring, <br />preparing the biweekly vibration monitoring reports for submittal, and management of the vibration control plan, as well as performing turbidity sampling. <br /> <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Hillsboro/Deerfield Beach Nourishment, Broward County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br /> 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Staff Engineer - The project consisted of the nourishment of a shoreline located in Broward County, Florida. Approximately 70,000 cubic yards of beach sand was hauled <br />in and placed. GFA performed construction materials testing, which consisted of conducting all laboratory testing at our USACE accredited laboratory as required by <br />project specifications, providing equipment and qualified engineering technicians to sample aggregate and soils, and providing a project manager/quality control <br />manager to supervise and coordinate all laboratory and field testing performed by GFA personnel. GFA provided turbidity sampling in accordance with project <br />specifications. GFA provided vibration monitoring services including a remote seismograph. Mr. Berry was responsible for performing vibration monitoring, preparing <br />the biweekly vibration monitoring reports for submittal, and management of the vibration control plan, as well as performing turbidity sampling. <br /> <br /> STANDARD FORM 330 (6/2004) PAGE 2 of 2 <br />129