Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not <br />specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) <br />HILLSBORO BEACH RENOURISHMENT TRUCK HAUL PROJECT <br />TOWN OF HILLSBORO BEACH, FLORIDA <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Eastman Aggregates <br />b. POINT OF CONTACT NAME <br />Mr. Sean Kemnuir <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(561) 969-7147 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />The project consisted of the truck haul placement of approximately +/-47,278 cubic yards of beach <br />fill between FDEP monuments R-6+750 to R-9 in Hillsboro Beach, Florida. The overall project was <br />for approximately 2,198 linear feet. <br /> <br />GFA Contract <br />• $9,170 <br /> <br /> <br />GFA Services <br />GFA provided pre and post-construction structural survey services, which consisted of performing <br />visual inspections and video documentations of nearby building exteriors, exterior stucco, glazing, <br />walkways/breezeways, and general structural conditions. GFA developed a vibration control plan, <br />monitored ground vibrations with remote seismograph systems, provided a vibration control <br />specialist and vibration technicians, and submitted biweekly reports to the QC Manager. GFA <br />performed quality control testing and management which consisted of laboratory testing services <br />(sieve analysis, material finer than 200, carbonate testing, Munsell soil color, and free shell <br />content). GFA also performed a Limited Soil and Groundwater Environmental Site Assessment <br />prior to the commencement of truck haul activity and after the project was completed to ensure <br />that the on-site fuel tank did not contaminate the area groundwater. <br /> <br />GFA Service Summary <br />• Geotechnical Engineering <br />• Pre-Construction Structural Survey <br />• Quality Control Plan <br />• Contractor Quality Control Testing <br />• Environmental Engineering <br /> <br /> <br /> <br /> <br />GFA Project #: 18-3880 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />GFA International, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />Delray Beach, FL <br /> <br />(3) ROLE <br /> <br />Pre and Post Construction Survey, Vibration <br />Monitoring, Quality Control, Materials Testing, <br />Environmental Engineering <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> STANDARD FORM 330 (1/2004) PAGE 3 <br /> 130