Laserfiche WebLink
Village of EsteroSunny Isles Beach RFQ 18-02-01 | Marine and Coastal Professional Engineering Consulting Services <br />APPROACH The Architecture Services under this contract will be provided by Synalovski, Romanik, Saye, LLC. (SRS). <br />Approach to Services – SRS and our team of consultants have extensive experience in the delivery of municipal and commercial projects in the State of Florida, inclusive of Marine & Coastal ServicesOur services begin with data collection. It is important that all stakeholders are part of the process so that any existing drawings, code compliance issues, relevant building maintenance information, pre-existing conditions, program requirements, systems and infrastructure evaluation, project budget, time constraints, et al. are identified and shared with the team at the beginning of the project. An existing site analysis will play a role in the building programming phase, since the site’s opportunities and limitations will be understood as early as possible.Our services continue with consultations with the City of Sunny Isles Beach staff to brainstorm regarding the programmatic needs, priorities and essential adjacencies of the project. The information shared will be documented in a written matrix that includes the space typology necessary, area requirements, equipment requirements, technology needs, finish and material evaluations, mechanical, electrical and plumbing needs and identifying significant relationships and hierarchy of the spaces.Next SRS will assimilate the information on the existing site and the desired programmatic needs into floor plan sketches that will be shared with the Project Team for review and evaluation. Commentary will be addressed and adjustments will be made to the plans so that <br />all stakeholders will be satisfied with the approach prior to proceeding with the construction documents process. In addition, an opinion of probable cost will be provided to the Construction Manger so that we all may confirm that the project is achievable within the budget. Should the project be out of alignment in relationship to the budget, now would be the time to have the discussions with the entire team, including our team of design consultants and City officials, about modifying the approach, evaluating the proposed systems, reducing scope, and evaluating alternate materials, equipment and systems.Once the initial program and project requirements have been established and funding has been confirmed, the team will continue to develop the design and will insure that the most cost effective sustainable project is emerging. Throughout this effort, bi-weekly meeting will take place, and all key personnel will remain involved in the process. SRS will also initiate the agency review processes which may include a site plan approval process, engineering permitting, etc. SRS will furnish all necessary documents to apply for and secure regulatory permits. At the end of design development, a progress set of plans and an updated opinion of probable cost will be issued to the City of Sunny Isles Beach for review and evaluation.Upon receipt of the City’s review of the design development plans at each stage of the design process (30%, 60% and 90%), SRS will shepherd the completion of the 100% construction documents. Site Planning, Architectural, Interior Design, Landscape Architecture, Environmental Engineering, Structural Engineering, Civil Engineering (Irrigation), Mechanical Engineering, Electrical Engineering, Plumbing, Fire Protection, <br />ARCHITECTURE <br />17