Laserfiche WebLink
12. NAME <br />Steve Foge <br />13. ROLE IN THIS CONTRACT <br />Senior Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />28 <br />b. WITH CURRENT FIRM <br />14 <br />15. FIRM NAME AND LOCATION (City and State) <br />Humiston & Moore Engineers, Naples FL <br />16. EDUCATION (Degree and Specialization) <br />B.S. Engineering, California State University, 1987 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certified 24-hour hazard materials technician oil spill 1st responder on call for the Ostego Bay Oil Spill Co-op in Fort Myers, FL <br />SCUBA, advanced open water certified <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Clam Pass 2013 reopening <br />Naples, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer responsible for coordination of hydrographic data with hydrographic surveyor, quality control of data sets, development of digital <br />terrain surfaces for use with H&M staff in design of dredge sections, beach disposal, computation of volumes, detailed development of permit <br />drawings and construction plans. Development of bid schedule and material quantities and costs for support on Opinion of Probable Costs <br />and Bid process. Coordinate with H&M staff for field control and construction management. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Honeymoon Island Beach Restoration & Erosion Control Project <br />Phase I and Phase II, Pinellas County Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2004-2012 <br />CONSTRUCTION (If Applicable) <br />2007-2008 & 2014-2015 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer responsible for coordination of hydrographic data with hydrographic surveyor, quality control of data sets, <br />development of digital terrain surfaces for use with H&M staff in design of beach and borrow areas, computation of volumes, detailed <br />development of permit drawings and construction plans, computation and exhibits for volumetric and shoreline change and monitoring <br />reports. Development of bid schedule and material quantities and costs for support on Opinion of Probable Costs and Bid process. Coordinate <br />with H&M staff for field control and construction management and monitoring. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Gordon Pointe Boat Basin and Floating Dock <br />Naples, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013-2015 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Assist with design and project management for the construction of a new marina basin, seawall, and concrete floating dock installation. <br />Generate plans, specs, bid documents and assist with contract development. Manage project and oversee construction. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Collier County Beach Monitoring 2011, 2012, 2015 through 2018 (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 – 2012, 2015 - 2018 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer responsible for coordination with other firms for historical data sets, coordination with hydrographic surveyor on necessary data <br />collection, quality control of data sets, development of digital terrain surfaces for evaluation of historical changes and project performance, <br />computation and exhibits for volumetric and shoreline change and monitoring report. Coordination with local environmental monitoring <br />consultant to ensure compliance with state and federal agencies’ required monitoring and reporting. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Wiggins & Doctors Pass Monitoring 2011 (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011-2012 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer responsible for coordination with other firms for historical hydrographic data sets, coordination with hydrographic surveyor on <br />necessary data collection, quality control of data sets, development of digital terrain surfaces for evaluation of historical changes and project <br />performance, computation and exhibits for volumetric and shoreline change and monitoring report. Coordination with local environmental <br />monitoring consultant to ensure compliance with state and federal agencies’ required monitoring and reporting. <br /> <br /> <br />80