|
12. NAME
<br />Steve Foge
<br />13. ROLE IN THIS CONTRACT
<br />Senior Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />28
<br />b. WITH CURRENT FIRM
<br />14
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Humiston & Moore Engineers, Naples FL
<br />16. EDUCATION (Degree and Specialization)
<br />B.S. Engineering, California State University, 1987
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certified 24-hour hazard materials technician oil spill 1st responder on call for the Ostego Bay Oil Spill Co-op in Fort Myers, FL
<br />SCUBA, advanced open water certified
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Clam Pass 2013 reopening
<br />Naples, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If Applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer responsible for coordination of hydrographic data with hydrographic surveyor, quality control of data sets, development of digital
<br />terrain surfaces for use with H&M staff in design of dredge sections, beach disposal, computation of volumes, detailed development of permit
<br />drawings and construction plans. Development of bid schedule and material quantities and costs for support on Opinion of Probable Costs
<br />and Bid process. Coordinate with H&M staff for field control and construction management.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Honeymoon Island Beach Restoration & Erosion Control Project
<br />Phase I and Phase II, Pinellas County Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2004-2012
<br />CONSTRUCTION (If Applicable)
<br />2007-2008 & 2014-2015
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer responsible for coordination of hydrographic data with hydrographic surveyor, quality control of data sets,
<br />development of digital terrain surfaces for use with H&M staff in design of beach and borrow areas, computation of volumes, detailed
<br />development of permit drawings and construction plans, computation and exhibits for volumetric and shoreline change and monitoring
<br />reports. Development of bid schedule and material quantities and costs for support on Opinion of Probable Costs and Bid process. Coordinate
<br />with H&M staff for field control and construction management and monitoring.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gordon Pointe Boat Basin and Floating Dock
<br />Naples, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013-2015
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Assist with design and project management for the construction of a new marina basin, seawall, and concrete floating dock installation.
<br />Generate plans, specs, bid documents and assist with contract development. Manage project and oversee construction.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Collier County Beach Monitoring 2011, 2012, 2015 through 2018 (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011 – 2012, 2015 - 2018
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer responsible for coordination with other firms for historical data sets, coordination with hydrographic surveyor on necessary data
<br />collection, quality control of data sets, development of digital terrain surfaces for evaluation of historical changes and project performance,
<br />computation and exhibits for volumetric and shoreline change and monitoring report. Coordination with local environmental monitoring
<br />consultant to ensure compliance with state and federal agencies’ required monitoring and reporting.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Wiggins & Doctors Pass Monitoring 2011 (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011-2012
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer responsible for coordination with other firms for historical hydrographic data sets, coordination with hydrographic surveyor on
<br />necessary data collection, quality control of data sets, development of digital terrain surfaces for evaluation of historical changes and project
<br />performance, computation and exhibits for volumetric and shoreline change and monitoring report. Coordination with local environmental
<br />monitoring consultant to ensure compliance with state and federal agencies’ required monitoring and reporting.
<br />
<br />
<br />80
|