Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing <br />table. <br />l "" d k b f <br /> 1 2 3 4 5 6 7 8 9 10 <br /> <br />Brett D. Moore, P.E. Project Manager (Point of <br />Contact) √ √ √ √ √ √ <br /> <br />Mohamed Dabees, PhD, P.E. Senior Coastal Engineer √ √ √ √ <br /> <br />Steve Foge Engineer/Quality Control √ √ √ <br /> <br />Marc Damon, P.E. Engineer √ √ √ √ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />1 Doctors Pass Erosion Control Structures Project 6 Apollo Beach Erosion Control Structures <br />2 Keewaydin Island projects 7 <br />3 Honeymoon Island Beach Restoration Project 8 <br />4 Singer Island Erosion Control Reef System 9 <br />5 South Siesta Key Beach Restoration Project-Phase II 10 <br /> <br />87