Laserfiche WebLink
| Page 15 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 <br />MANDATORY USE DATE OF FORM 6/2004 <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 (Est.) 2018 (Est.) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Conducted an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible development envelope for the project design, followed by FDEP CCCL permitting and marine turtle lighting approvals for the project which includes a large parking pedestal and tower with amenity/pool deck. Worked closely with Miami-Dade County to process notices to proceed under their federal, state and county beach renourishment permits for a 28,500 c.y. beach fill project. Mr. Blankenship serves as engineer-of-record for the truck haul beach renourishment event. <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Key Biscayne Beach Management, Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2020 (Est.) 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Completed the design, permitting and construction administration for a 26,000 cubic yard truck haul beach nourishment along 6,000 feet of shoreline. Physical and biological monitoring is ongoing to confirm compliance with environmental permit conditions. Mr. Blankenship serves as Engineering Project Manager and engineer-of-record, overseeing Client management, public relations, field surveys, coastal engineering assessments, design, construction, and beach performance evaluations.