Laserfiche WebLink
| Page 16 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 <br />MANDATORY USE DATE OF FORM 6/2004 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Yong Chen, Ph.D., P.E. Senior Coastal Engineer a. TOTAL b. WITH CURRENT FIRM <br />30 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) <br />PhD, Civil and Structural Engineering, MS, River <br />and Coastal Engineering, BS, Harbor and <br />Waterway Engineering <br />P.E., Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Dr. Chen has 30 years of experience in all phases of coastal engineering projects involving planning of field investigations and processing <br />of field data from hydrographic surveys, geotechnical and wave/current gauges; navigation channel planning, port and harbor p lanning <br />and sediment dredging analysis; FEMA coastal floodplain mapping; wave statistical analysis, wave propagation, storm surge analysis <br />and sediment transport analysis; structural design projects involving riprap shore protection, breakwaters, jetties, single point mooring <br />systems, marina basins, dredging, and beach nourishment and management. <br />Dr. Chen has extensive experience in developing and utilizing software packages for numerical model simulations of coastal processes. <br />He has applied the DHI MIKE21 modules for wave propagation and transformation, hydrodynamics, as well as the sediment transport <br />packages. He has applied numerical modeling to optimize the planning and design of shore protection projects worldwide. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Village of Bal Harbour Beach Management, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 N?A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Coastal engineer responsible for evaluation of coastal processes and sediment transport downdrift of Bakers Haulover Inlet. <br />Conducted feasibility study to evaluate inlet bypassing options to maintain sediment transport and reduce beach erosion in Bal <br />Harbour and Miami-Dade County beaches. <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2021 (Estimated) 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Provided coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in <br />accordance with the permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. <br />Dr. Chen serves as senior coastal engineer reviewing the design and construction plans. He has also provided quality control <br />reviews for physical monitoring reports of project performance. <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 (Estimated) 2018 (Estimated) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Coastal engineering planning and design for 28,500 c.y. beach fill project to be constructed in 2018 by the developer as part of <br />the Florida DEP CCCL permit process Dr. Chen provided coastal engineering and quality control for the planning and design of <br />the beach nourishment. <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Town of Palm Beach South Restoration, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Coastal engineer responsible for feasibility study, equilibrium toe of fill (ETOF)assessment, and sediment transport modeling to <br />support application processing for beach nourishment project. Evaluated sediment coming from updrift beach renourishment to <br />opoptimize beach fill design to minimize impacts to nearshore hardbottom within Reach 8. Developed construction plans for <br />dune and beach nourishment.