Laserfiche WebLink
| Page 17 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Key Biscayne Beach Management, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2020 (Est.) 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Completed the design, permitting and construction administration for a 26,000 cubic yard truck haul beach nourishment along <br />6,000 feet of shoreline. Physical and biological monitoring is ongoing to confirm compliance with environmental permit <br />conditions. Dr Chen was the senior coastal engineer responsible for the equilibrium toe of fill (ETOD) analysis for the beach fill <br />and served as project engineer for the beach nourishment design. <br />