Laserfiche WebLink
| Page 18 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 <br />MANDATORY USE DATE OF FORM 6/2004 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Michael N. Herrman, PE Waterfront and Docks a. TOTAL b. WITH CURRENT FIRM <br />19 19 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Tampa, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) <br />MCE Coastal Engineering; BCE Civil Engineering Florida, 66025, 2007 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Herrman joined Moffatt & Nichol in 1997 following completion of his graduate studies in Coastal Engineering. Responsibilities <br />include serving as project engineer or project manager on a wide range of urban waterfronts and marina projects. He conducts marina <br />feasibility and market assessment studies for boating regions throughout the U.S., the Caribbean, and Central America. Related design <br />experience includes planning, engineering, environmental impact assessments, including marina water quality assessments, permit <br />facilitation, and construction support services. Specific design experience includes design of navigation, dredging, dock systems and <br />marina related elements. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019 (Estimated) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project <br />in accordance with the regulatory permits. Michael Herrman served as coastal engineer in the preparation of the physical <br />monitoring for the beach fill preparing volumetric and shoreline analyses from survey data. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Palm Harbor Marina, West Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2010 2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Contract to provide engineering services from preliminary master planning through construction for the redevelopment and <br />expansion of an existing 160-slip commercial marina into a world-class 196-slip mega-yacht marina facility. Michael Herrman <br />served as project engineer supporting the project manager in the review of plans and calculations as well as load cases from <br />the floating dock vendor. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Tampa Riverwalk, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Contract to provide planning, permit support, and design services for the waterside components of this urban waterfront <br />regeneration effort. Michael Herrman served as project engineer with the shoreline stabilization. <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Residences by Armani/Casas, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 2017 (Estimated) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Contract to conduct an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible <br />development envelope for the project design, which includes a large parking pedestal and tower with amenity/pool deck. <br />Michael Herrman served as project engineer for the 100-year storm erosion analysis in accordance with FDEP CCCL <br />guidelines. He also served as project engineer for the 36,000 cy beach nourishment. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />St. Petersburg Municipal Marina Mooring Field Design St. Petersburg, Florida <br />PROFESSIONAL SERVICE CONSTRUCTION (if applicable) <br />2015 2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Project Manager responsible for layout, permitting, design, and construction support for the 26-slip mooring field. Elements <br />include a floating dinghy dock, security gate, access gangway and fixed access platform, and utilities, including solar power <br />lighting and potable water. Permitting requirements resulted in two construction phases and periodic communications with <br />permitting agencies on construction progress. <br />