| Page 18
<br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018
<br />Marine And Coastal Professional Engineering Consulting Services (CCNA)
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Michael N. Herrman, PE Waterfront and Docks a. TOTAL b. WITH CURRENT FIRM
<br />19 19
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Tampa, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />MCE Coastal Engineering; BCE Civil Engineering Florida, 66025, 2007
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Herrman joined Moffatt & Nichol in 1997 following completion of his graduate studies in Coastal Engineering. Responsibilities
<br />include serving as project engineer or project manager on a wide range of urban waterfronts and marina projects. He conducts marina
<br />feasibility and market assessment studies for boating regions throughout the U.S., the Caribbean, and Central America. Related design
<br />experience includes planning, engineering, environmental impact assessments, including marina water quality assessments, permit
<br />facilitation, and construction support services. Specific design experience includes design of navigation, dredging, dock systems and
<br />marina related elements.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2019 (Estimated) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project
<br />in accordance with the regulatory permits. Michael Herrman served as coastal engineer in the preparation of the physical
<br />monitoring for the beach fill preparing volumetric and shoreline analyses from survey data.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Palm Harbor Marina, West Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2010 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to provide engineering services from preliminary master planning through construction for the redevelopment and
<br />expansion of an existing 160-slip commercial marina into a world-class 196-slip mega-yacht marina facility. Michael Herrman
<br />served as project engineer supporting the project manager in the review of plans and calculations as well as load cases from
<br />the floating dock vendor.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Tampa Riverwalk, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to provide planning, permit support, and design services for the waterside components of this urban waterfront
<br />regeneration effort. Michael Herrman served as project engineer with the shoreline stabilization.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Residences by Armani/Casas, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2016 2017 (Estimated)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to conduct an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible
<br />development envelope for the project design, which includes a large parking pedestal and tower with amenity/pool deck.
<br />Michael Herrman served as project engineer for the 100-year storm erosion analysis in accordance with FDEP CCCL
<br />guidelines. He also served as project engineer for the 36,000 cy beach nourishment.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />St. Petersburg Municipal Marina Mooring Field Design St. Petersburg, Florida
<br />PROFESSIONAL SERVICE CONSTRUCTION (if applicable)
<br />2015 2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Project Manager responsible for layout, permitting, design, and construction support for the 26-slip mooring field. Elements
<br />include a floating dinghy dock, security gate, access gangway and fixed access platform, and utilities, including solar power
<br />lighting and potable water. Permitting requirements resulted in two construction phases and periodic communications with
<br />permitting agencies on construction progress.
<br />
|