| Page 19
<br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018
<br />Marine And Coastal Professional Engineering Consulting Services (CCNA)
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Nicole Pauly, PE Structures a. TOTAL b. WITH CURRENT FIRM
<br />7 5
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Tampa, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />MSCE Civil Engineering; BSCE Civil Engineering Florida, 78638, 2014
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Pauly is a structural engineer with over seven years of experience in the design of waterfront structures with expertise in the
<br />inspection, planning, design, preparation of permitting and construction documents, and post-construction award services for a
<br />variety of ports, marinas, and other waterfront facilities.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Palm Harbor Marina, West Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2010 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to provide engineering services from preliminary master planning through construction for the redevelopment and
<br />expansion of an existing 160-slip commercial marina into a world-class 196-slip mega-yacht marina facility. Nicole Pauly served
<br />as a project engineer with the structural design of the shoreline stabilization.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Tampa Riverwalk, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to provide planning, permit support, and design services for the waterside components of this urban waterfront
<br />regeneration effort. Nicole Pauly served as a structural engineer for the project.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />RMK Merrill Stevens North Yard Redevelopment, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2017 (est) 2017 (est)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Engineering design of shipyard redevelopment with Shiplift to accommodate vessels up to 200 feet in length. Marine structural
<br />design of Shiplift basin, hoist foundations, and 4 pile-supported transfer berths. Ms. Pauly is structural engineer for the sheet
<br />pile bulkheads, hoist platforms, and transfer berth structural components.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Georgetown Canal Restoration and Shoreline Stabilization, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2016 (Estimated) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Structural engineer involved in the design and preparation of bid documents for the waterfront structures in a 150 acre
<br />residential development featuring an interconnected canal system with 23,000 linear feet of bulkhead and concrete retaining
<br />walls.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Dunedin Municipal Marina, Dunedin, Florida PROFESSIONAL SERVICE CONSTRUCTION (if applicable)
<br />2014 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Project engineer for a multi-phase bulkhead and dock rehabilitation project for the City of Dunedin. Services provided include
<br />above water structural assessments of waterfront structures, completion of permit applications, waterfront structure
<br />repair/replacement designs, preparation of construction drawings, technical specifications, opinion of probable costs, and
<br />construction support services.
<br />f.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Dinner Key North Mooring Field, Miami, PROFESSIONAL SERVICE CONSTRUCTION (if applicable)
<br />2018(est) 2019 (est)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contracted for the marine structures design and environmental permitting of a public managed mooring field, along with
<br />associated channel realignment and motorized vessel exclusion zones. Managed the marine resource and hydrographic
<br />surveys conducted, and the mooring field layout was established based on minimum water depths required to protect water
<br />quality. Ms. Pauly is the Project Engineer completing the design and construction plans.
<br />
|