Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />31  <br />01C032018D  <br />  <br />Jordon Cheifet, PE, CFM <br />Project Manager <br />Jordon Cheifet, PE, CFM has been selected as Project Manager for the City’s  <br />engineering tasks. He is a marine/coastal engineer with more than 12 years of  <br />technical and project management experience, including beach programs,  <br />waterfront structure design, FEMA coastal floodplain mapping, shoreline  <br />restoration/protection design, numerical modeling, and marina design. Mr.  <br />Cheifet is a registered professional engineer in the State of Florida and a Certified  <br />Floodplain Manager. He gained significant experience working in the City of Sunny  <br />Isles Beach with his former firm. Mr. Cheifet was the engineer of record of the Phase II – Coastal  <br />Structures Feasibility Study prepared for the City in 2015. The report updated the original Phase I Study’s  <br />recommendations, prepared for the City in 2009, based on recently completed or planned beach  <br />management projects in South Florida, the feasibility of coastal structures, a beach performance  <br />evaluation, the current environmental regulatory climate, and available funding strategy mechanisms. Mr.  <br />Cheifet also evaluated the use and feasibility of innovative technologies for beach management in the  <br />City.  <br />In addition to his work on the Phase II Study, Mr. Cheifet performed an underwater assessment of the  <br />two submerged breakwaters located at the north end of the City. The structures were built in 2001 to  <br />mitigate end losses associated with a large fill project at that time. The underwater assessment found the  <br />structures to have reduced height and cross‐section resulting from storm impacts and settlement.  <br />Recommendations for repair were provided in an Underwater Investigation Report to the City.  <br />Mr. Cheifet also worked with private developers at his former firm to support condominium development  <br />in the City. This work included securing Coastal Construction Control Line permits, performing 100‐year  <br />storm erosion analyses, wave load analyses, hydraulic flow analyses, and FEMA Letters of Map Change.  <br />  <br />Beau Suthard, PG <br />Marine Geophysicist <br />Mr. Suthard has been with APTIM since 2005 conducting coastal and marine  <br />geophysical, geotechnical and hydrographic surveys. He has conducted multiple full  <br />geologic mapping studies required for engineering projects (including both field  <br />operations and office‐based data processing, analysis, and interpretation), geologic  <br />stratigraphic evaluations, sediment search investigations and cultural resource  <br />investigations including sidescan sonar, seismic‐reflection, fathometer, and  <br />magnetometer surveys. He has conducted vibracore collection and analysis in support of large‐scale  <br />mapping and hydrographic projects of multiple coastal and estuarine systems throughout the southern  <br />and eastern United States and Brazil.  <br />  <br />Douglas Mann, PE, D.CE <br />Senior Coastal Engineer <br />Douglas Mann, PE, will provide coastal engineering services to the City. His  <br />expertise in permitting and managing coastal armoring structures will assist the  <br />City in addressing your coastal structural challenges. Mr. Mann has permitted  <br />over 75 Coastal Construction Control Line (CCCL) permits for clients ranging  <br />from coastal armoring structures, to public dune overwalks, and dune  <br />restorations.